You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Hydrosat: Next Generation High-Resolution Daily Surface Temperature for Interconnected Earth Processes

    SBC: HYDROSAT INC            Topic: 94

    Temperature is the critical signal that allows monitoring of a myriad of Earth’s processes. From direct measurements of wildfire and urban heat to more complex relationships with drought, agriculture, aquaculture, and biodiversity, maintaining a steady pulse on Earth’s surface temperature enables us to mitigate for and adapt to the impacts of extreme events and increasingly variable water avai ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Low SWaP, UxS-Mounted System for In-Situ Monitoring of Harmful Algal Blooms

    SBC: HYDROSAT INC            Topic: 92

    The brevetoxins (PbTx) produced by Karenia brevis cause harmful algal blooms (HAB) or "red tide" in seawater. Currently, the only available ways of detecting PbTx are laboratory tests such as enzyme-linked immunosorbent assays, which are expensive and slow, and require complex instrumentation and multiple processing steps. In previous work Intelligent Optical Systems (IOS) demonstrated a compact l ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Intelligent Automation of Trace Identification Processes for Complex Mission Critical Robotics Systems

    SBC: SAFA.AI, INC            Topic: T10

    Achieving trustworthy and trusted autonomy starts early in the development process through performing hazard analysis, fault analysis, identifying mitigating requirements, and carefully and rigorously tracing those requirements all the way into design, models, implementation, and tests. However, traceability can be time-consuming, costly, and error-prone. To address these challenges, significant a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  4. Lunar Truss Design and Construction

    SBC: Bond Technologies, Inc.            Topic: Z14

    This project will advance technology for the automated assembly of large truss towers.nbsp; Assembly of truss-based structures is one of the leading candidates for establishing some of the early lunar infrastructure.nbsp; Specifically, joining technologies and robotic tools are required to enable autonomous/automated assembly of tall towers as well as shelters, domes and habitats.nbsp; Automated a ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  5. Fleet and Flight Operations Integration and Optimization in a Mixed-Advanced Air Mobility Environment

    SBC: AERIAL VANTAGE, INC.            Topic: A3

    We propose an innovation for a data-driven Artificial Intelligence/Machine Learning (AI/ML) model for uncrewed aviation fleet and flight operations optimization (UA-FFOpt) that will be trained with real-world data from an active flight program in the State of Michigan and at a partner cattle ranch in Florida. UA-FFOpt will leverage our existing Intellectual Property (IP), AVIATE, and NCR. AVIATErs ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  6. Materials Modeling Hub: Interoperable and Collaborative Multi-Scale Modeling Ecosystem for Data Analysis, Visualization, and Management

    SBC: MATERIALS DATA MANAGEMENT INC            Topic: S17

    Materials Modeling Hub (MMH) software integrates modeling, product design, manufacturing, and usage cycle into a digital ecosystem to accelerate, simplify, and strengthen ideation through implementation. When combined with a viable materials information management strategy, modeling techniques can replicate and predict experimental outcomes and material performance with growing accuracy. In indust ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  7. Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets

    SBC: 60Hertz Incorporated            Topic: 92

    We propose to use Aerosol Optical Depth (AOD) measurements as an early warning system, to cue on-site validation of the soiling station and any available meteorological (MET) station data to validate if a work order to clean deposited particulate matter is necessary. This would move from reactive maintenance – often weeks delayed, to proactive maintenance – getting ahead of the weather impact ...

    SBIR Phase I 2022 Department of CommerceNational Oceanic and Atmospheric Administration
  8. Solid State Welding for Space

    SBC: T.G.V. ROCKETS INC.            Topic: Z4

    TGV proposes to build a modular testbed that can scale ultrasonic additive manufacturing and test multiple material combinations in vacuum conditions.nbsp; A lighter smaller sonotrode will be developed which will be tracable to testing on ISS or future space platforms but can serve to mature solid state welding designs and concepts in the current era

    SBIR Phase I 2022 National Aeronautics and Space Administration
  9. Electric Motor Fault Resilience

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A1

    The detection and mitigation of electric motor faults is vital to the safety and reliability of Urban Air Mobility (UAM) vehicles using electric propulsion. The proposed research aims to advance the state of the art of motor fault resilience research relevant to the NASA Revolutionary Vertical Lift Technology (RVLT) Project in two aspects: (1) develop fault resilience measures appropriate to the m ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
  10. Assembly of Large Aperture Space Telescopes in Cislunar Space Using a Swarm of Autonomous Small Satellites

    SBC: TEN ONE AEROSPACE LLC            Topic: T10

    NASA and industry are expressing a growing interest in autonomous robotic in-space assembly and servicing of large aperture space telescopes in cislunar space and at Sun-Earth L2 (SEL2). The recently launched James Webb Space Telescope (JWST) will operate at SEL2 for about 5-10 years until fuel for station keeping and attitude maneuvers is depleted. At this point JWST will essentially become inope ...

    STTR Phase I 2022 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government