You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Proposed Project Title Atlantis AI Based Long Range Space Weather Prediction System

    SBC: Atlantis Industries, Inc.            Topic: 95

    To date, no realizable method of predicting the occurrence or magnitude of a Solar Energetic Particle (SEP) event has been developed. There are multiple models currently available in the Community Coordinated Modeling Center (CCMC) through Goddard Space Flight Center that attempt to provide timely and accurate event propagation (e.g.MAG4, Enlil, and SEPMOD). None of these have yet achieved the goa ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. SurveyorBot: A Proof of Value Precursor Mission for Launch / Landing Pad Geotechnical Assessment

    SBC: EXPLORATION ARCHITECTURE CORPORATION            Topic: T7

    Building lunar infrastructure requires moving regolith in unprecedented quantities both to produce level areas,nbsp;cutting in some areas, filling in others, for the infrastructurersquo;s construction, It also requires excavation to provide regolith feedstock for beneficiation and in situ manufacturing of the materials from which much of the infrastructure is to be built.Regolith handling characte ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  3. Heat Transfer Correlations for Complete Cryogenic Pool Boiling Curve

    SBC: MUDAWAR THERMAL SYSTEMS INC            Topic: T14

    The proposed effort concerns technologies related to cryogenic propellant production, storage, transfer, and usage to support NASArsquo;s in-situ resource utilization (ISRU) goals. nbsp;They include a broad range of applications, scales, and environments consistent with future NASA missions to the Moon and Mars.nbsp;nbsp;More specifically, the project will addressnbsp;development of a piecewise-sm ...

    STTR Phase II 2023 National Aeronautics and Space Administration
  4. 3D Printing of High Temperature Thermoset Foams for Space Vehicular Thermal Protection Systems

    SBC: RE3D, INC.            Topic: T12

    nbsp;Based on the knowledge and expertise gained in partnership with the University of Tennessee at Knoxville (UTK) during the NASA/STTR Phase I work, re:3D proposes the development of a pilot system for the deposition of a phenolic foam TPS surface onto a scaled demonstration article in parallel with refinements and improvements to the foamrsquo;s material characteristics.The Phase II research ac ...

    STTR Phase II 2023 National Aeronautics and Space Administration
  5. Intelligent Automation of Trace Identification Processes for Complex Mission Critical Robotics Systems

    SBC: SAFA.AI, INC            Topic: T10

    Achieving trustworthy and trusted autonomy starts early in the development process through performing hazard analysis, fault analysis, identifying mitigating requirements, and carefully and rigorously tracing those requirements all the way into design, models, implementation, and tests. However, traceability can be time-consuming, costly, and error-prone. To address these challenges, significant a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  6. Mission Operations Digital Twin for Decision Making(MODT)

    SBC: SIMCRAFT LLC            Topic: T11

    The proposed innovation is to design and demonstrate an End-to-End Space Mission Operations Digital Twin (MODT) Platform for collaborative multi-disciplinary analysis and decision making in Mission Control.nbsp; This platform will provide situational awareness across the flight control team and crew, through a hyper-realistic, multi-user, multi-modal virtual environment that integrates existing (a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  7. Space Qualified, 3D-Printed, Electronic Assembly Demonstration (SPEAD) Printed Circuit Boards

    SBC: NANOHMICS INC            Topic: T12

    Recent advances in techniques for Additively Manufactured Electronics (AME) have the potential to produce electronics assemblies that are uniquely compact and conformable, but these techniques have not been proven effective for space applications. Designing and fabricating printed circuit boards (PCBs) that can meet rigorous space flight qualifications specifications is challenging. There are curr ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  8. Conveyance, Filtering, and Feed System for Lunar Brickbot Technology Demonstrator for Landing Pad Construction

    SBC: ASTROPORT SPACE TECHNOLOGIES, INC.            Topic: T12

    Our Brickbot conveyance system comprises of bucket drums and annbsp;electromagnetic sieving and filtering system mounted on a robotic mobility platform used for initial risk reduction test demonstrations. Anbsp;method to scoop the uncompacted top surface layer of lunar regolith is employed to depositnbsp;acquired regolith directly over the top of the robotrsquo;s shroud cover which is modified to ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  9. Dust tolerant dynamic seal material for extreme lunar atmosphere

    SBC: ATSP Innovations, Inc.            Topic: Z13

    NASA is interested in long-term operation in the lunar environment, Mars and small bodies such as asteroids, comets, and Near-Earth Objects. Dust Tolerant Mechanisms and specifically the listed interest in sealing materials and techniques that can keep out regolith and operate in the extreme Moon/Mars environments are of high interest. The Moon is covered by large amounts of dust particles, called ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  10. Scalable Magnetically Geared Actuator for Future Missions in Dusty & Extremely Cold Environments

    SBC: FLUXWORKS LLC            Topic: Z13

    Gearboxes are critical for reducing the mass of drivetrains but the lubrications that they require struggle with extremely cold and dusty environments.nbsp; Magnetic gears (MGs) are a promising noncontact alternative that does not require lubrication; however, existing topologies either struggle to achieve high gear ratios (coaxial MGs) or suffer from reliability and efficiency limitations (cycloi ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government