You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Portable Vibrio Cholerae Concentrator for Sensitive Pathogen Detection in Water
SBC: OMNIVIS INC Topic: NoneThis SBIR Phase I project proposes to develop an easy to use, inexpensive, and portable bacterial concentrator to enable more sensitive cholera pathogen (Vibrio cholerae) detection. Cholera affects communities across 41 countries, including Mozambique in 2019 after Cyclone Idai and Yemen in 2017. Current methods used to detect the cholera pathogen in water involves a 3 to 5-day procedure due to th ...
SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology -
Planar Chemiluminescence Absorption Tomography
SBC: En'urga Inc. Topic: T2nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp; Enrsquo;Urga Inc. will evaluate the feasibility of utilizing Planar Chemiluminescence Absorption Tomography (PCAT) to characterize the combustion process at the exit plane of rotating detonation enginesnbsp;(RDEs).nbsp; The two key issues that will be addressed during the Phase I work are: (1) the feasibility of non-intrusive determination of ...
STTR Phase I 2019 National Aeronautics and Space Administration -
Neuroevolution of Electronic Liquid State Machines
SBC: Warrant Technologies LLC Topic: H6The subtopic being addressed identifies current spacefaring computer hardware as insufficient for executing conventional artificial intelligence (AI) algorithms due to space, weight, and power constraints. Conversely, neuromorphic computing architectures have exhibited the ability to performatively execute AI programs while meeting these criteria. Presented here is one such general purpose neuromo ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Aerodynamically Stable DragSails for Spacecraft Deorbit
SBC: VESTIGO AEROSPACE, INC. Topic: Z8The safe disposal of spacecraft upon mission completion is necessary to preserve the utility of high-value orbits. It is forecasted that up to 2,600 nanosatellites and microsatellites will be launched into orbit over the next five years, and plans for large commercial constellations consisting of thousands of small satellites in low Earth orbit are currently in development. nbsp;NASArsquo;s Small ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
A Modular Sensor Suite for Propulsion Testing
SBC: En'urga Inc. Topic: H10nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp; Enrsquo;Urga Inc. will evaluate the feasibility of utilizing a modular sensor suite as general purpose combustion diagnostic for rocket propulsion systems. nbsp;The two key issues that will be addressed during the Phase I research work are: (1) the feasibility of configuring a modular tomographic sensor suite that can be used measure path int ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
In-Space Manufacturing of Microfluidic Chips for Biological Research
SBC: TECHSHOT, INC. Topic: H8According to a recent Grand View Research report, the global 3D bioprinting market size was valued at USD 965.0 million in 2018 and is anticipated to grow at over 19.5% for the next 10 years. This includes all aspects of medical materials including metals, plastics, ceramics, biomaterials, cells, tissues and organ substitutes.nbsp; Advances in bioprinting are gaining importance and the tissues gen ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Smart Memory Accelerator for Data Intensive and High Performance Computing Applications
SBC: SIMULTAC LLC Topic: S5This exploratory research will evaluate an alternative parallel non-von Neumann architecture class (Continuum Computer Architecture or CCA) in order to open new opportunities to extreme parallelism not available through conventional practices while mitigating current challenges to efficiency by means of fine grain hardware structures related to communication latency, synchronization overheads, ada ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
ADAPTIVE RAY TRACING OF TIME-DEPENDENT FLOWS ON MASSIVELY PARALLEL COMPUTERS
SBC: Data Parallel Systems, Inc. Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
OPERATIONS PLANNING WITH NEURAL NETWORKS
SBC: Nienhaus & Associates, Inc. Topic: N/AADVANCEMENTS IN OPERATIONS PLANNING ALGORITHMS ARE SOUGHT FOR USE IN SIMULATIONS WITH THE JPL TIME WARP OPERATING SYSTEM (TWOS) EXECUTING ON PARALLEL COMPUTERS. OUR OBJECTIVE IS TO DETERMINE THE FEASIBILITY OF OPERATIONS PLANNING WITH NEURAL NETWORKS AS THE DECISION MAKING MECHANISM. THE EFFORT WILL CONSIST OF CONSTRUCTION OF A NETWORK MODEL, MODEL INITIALIZATION, AND TESTING. EXPERIMENTS INVOLVIN ...
SBIR Phase I 1992 National Aeronautics and Space Administration -
ADVANCED FLIGHT HARDWARE FOR ORGANIC SEPARATIONS
SBC: TECHSHOT, INC. Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration