You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Heat Transfer Correlations for Complete Cryogenic Pool Boiling Curve

    SBC: MUDAWAR THERMAL SYSTEMS INC            Topic: T14

    The proposed effort concerns technologies related to cryogenic propellant production, storage, transfer, and usage to support NASArsquo;s in-situ resource utilization (ISRU) goals. nbsp;They include a broad range of applications, scales, and environments consistent with future NASA missions to the Moon and Mars.nbsp;nbsp;More specifically, the project will addressnbsp;development of a piecewise-sm ...

    STTR Phase II 2023 National Aeronautics and Space Administration
  2. Intelligent Automation of Trace Identification Processes for Complex Mission Critical Robotics Systems

    SBC: SAFA.AI, INC            Topic: T10

    Achieving trustworthy and trusted autonomy starts early in the development process through performing hazard analysis, fault analysis, identifying mitigating requirements, and carefully and rigorously tracing those requirements all the way into design, models, implementation, and tests. However, traceability can be time-consuming, costly, and error-prone. To address these challenges, significant a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  3. Radar Vision Systems for Enhanced Robotic Mobility, Precise Navigation, and Multi-Vehicle Coordination

    SBC: ALOFT SENSING INC            Topic: S13

    Aloft Sensing Inc. (Aloft) proposes to adapt and establish the feasibility of our scalable Radar Vision Systems (RVS) for operation on solar system bodies. RVS consist of state-of-the-art multichannel mm-wave radars coupled with our patent-pending position, navigation, and timing algorithms (AloftPNT). Demonstrated through simulations and field experiments, these systems achieve both accurate self ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  4. Single-Aisle Aircraft LH2 Storage System

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: A1

    GTLrsquo;s breakthrough ultra-lightweight composite dewar-tank technology is game changing by providing hydrogen weight fractions in excess of 59% for small tanks, with over 70% achievable with medium scale LH2 tanks, including vacuum insulation. This capability addresses a critical need in the conversion of single-aisle aircraft from Jet-A to liquid hydrogen to eliminate carbon emissions. With GT ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  5. Ultra-Fast Ultrasonic Clothes Washer/Dryer Combination for Moon, Mars and ISS Applications

    SBC: Ultrasonic Technology Solutions, LLC            Topic: H3

    Ultrasonic Technology Solutions (UTS) is based in Knoxville, Tennessee, and formed as a spin-off start-up from Oak Ridge National Laboratory (ORNL) is proposing to develop an ultra-fastnbsp;ultrasonic washing and dryer combination for space applications.NASArsquo;s Life Support and Habitation Systems Focus Area seeks key capabilities and technology solutions that enable extended human presence in ...

    SBIR Phase II 2023 National Aeronautics and Space Administration
  6. Collaborative Multidimensional Trade Space Analysis Capability

    SBC: SYSTEM STRATEGY INC            Topic: S17

    The Collaborative Tradespace Capability (CTC) prototype proposed by the SSI team is designed to address critical areas of interest to NASA, such as improving model interoperability, managing varying levels of fidelity/uncertainty, and rapidly and iteratively operating across a distributed collaborative environment to characterizenbsp;and selectnbsp;optimum candidates. The goal of the Phase I proje ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  7. Lunar Truss Design and Construction

    SBC: Bond Technologies, Inc.            Topic: Z14

    This project will advance technology for the automated assembly of large truss towers.nbsp; Assembly of truss-based structures is one of the leading candidates for establishing some of the early lunar infrastructure.nbsp; Specifically, joining technologies and robotic tools are required to enable autonomous/automated assembly of tall towers as well as shelters, domes and habitats.nbsp; Automated a ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  8. Expeditionary BVLOS Infrastructure and UTM for Airborne Wildfire Response

    SBC: ANZEN UNMANNED, LLC            Topic: A3

    Current aerial wildfire management is limited by existing operational limitations imposed by regulations and manual airspace management techniques, preventing integration of new aircraft types such as UAS. Core issues preventing optimal use of the wildfire response airspace are:Lack of integrated planning and deconfliction between manned aircraft and UASLack of manned aircraft situational awarenes ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  9. P23-014 Co-design of Shared Tasking with human and Autonomous Robot teams (Co-STAR)

    SBC: SOAR TECHNOLOGY INC            Topic: Z5

    Space operations are undergoing a paradigm shift towards persistent assets in space, supported by coordinated, adjustable human-robot partnerships. Such partnerships require enabling technologies which can: support co-design of reference missions, partner robots and novel human-robot teaming paradigms to assist in integrated mission planning and execution. To address these challenges, SoarTech, al ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  10. P23-016 Autonomous Virtual Agent for Interactive Explanation (AVA-Ex)

    SBC: SOAR TECHNOLOGY INC            Topic: H6

    Due to delays in communication during deep space missions, astronauts will need to solve more problems without connection to ground teams. To reduce overburdening, the astronauts will leverage new decision aids including procedure generation tools. New virtual assistants are needed that can explain decision aid outputs, reducing ambiguity, increasing task performance, and helping to calibrate astr ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government