List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: Analysis And Measurement Services Corporation            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: Analysis And Measurement Services Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. Hypersonic Neurocontrol Actuator and Testbed

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  4. Improved Temperature Measurement in Composite Material for Aerospace Applications

    SBC: Analysis And Measurement Services Corporation            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  5. Digital Design Derivation System for Hardware Synthesis

    SBC: Derivation Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  6. Knowledge-Based System Developer for Aerospace Applications

    SBC: Erc, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  7. Hybrid Forecasting Tool for Distriuted Mission Planning

    SBC: Nienhaus & Associates, Inc.            Topic: N/A

    Traditional project management relies on hierarchically structured projects. As organizations decentralize, the need for distributed planning increases concomitant with a greater need for communication. Operations planning through distributed simulation has been shown to be an appropriate means of organizational role playing. We propose as the innovation to apply a hybrid Genetic Algorithm and dec ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  8. Biotechnology Instrumentation for the Support of Embryogenesis

    SBC: TECHSHOT, INC.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  9. Reusable, Thermally Controlled Container for Storage and Transport of Biological Samples

    SBC: TECHSHOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  10. Thrustmeters for Engine Management and Control Systems

    SBC: Telectro-mek, Inc. (tmi)            Topic: N/A

    A simplified display which shows real-time thrust reduces pilot workload and increases safety in jet aircraft. Engine thrust, one of the more important engine parameters, is not currently measured, but is estimated from various sensor readings, such as EPR (Engine Pressure Ratio), spool speed, fuel flow, and turbine inlet temperatures. This project will demonstrate the advantages of using a system ...

    SBIR Phase I 1994 National Aeronautics and Space Administration

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government