You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Flight Test Development of the X43A-LS Reusable Launch Vehicle

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    Accurate Automation Corporation proposes a three-pronged effort to build on the Phase I program to develop technologies in support of the NASA Hyper-X program and the X-43 series of research vehicles (X-43A, X-43B, and X-43C). The data and technologies developed under the proposed Phase II program will also support the development and testing of future hypersonic vehicles and reusable launch vehic ...

    SBIR Phase II 2003 National Aeronautics and Space Administration
  2. SBIR Phase I: C5: an Educational Simulation Architecture for Wireless Handhelds

    SBC: Agentsheets, Inc            Topic: N/A

    This Small Business Innovation Research Phase I project uses wireless handheld devices that are interconnected to create an educational simulation architecture called C5, supporting simulations that are compact, connected, continuous, customizable, and collective. C5 tightly connects four information technologies: handheld devices to run individual and distributed simulations; a desktop computer ...

    SBIR Phase I 2003 National Science Foundation
  3. SBIR Phase I: Mobility Agents for Persons with Cognitive Disabilities

    SBC: Agentsheets, Inc            Topic: N/A

    This Small Business Innovation Research Phase I project will develop Mobility Agents that help persons with cognitive disabilities use public transportation systems and help caregivers customize these agents to serve the specific needs of the travelers. Increasingly, public transportation systems are equipped with GPS (Global Positioning System) systems connected to control centers through dedica ...

    SBIR Phase I 2003 National Science Foundation
  4. STTR Phase I: Novel Nanocoated Ferromagnetic Materials

    SBC: ALD NANOSOLUTIONS, INC            Topic: N/A

    This Small Business Technology Transfer Phase I project will apply novel Atomic Layer Deposition (ALD) technology for the encapsulating of ultrafine particle surfaces used in certain advanced materials for aerospace applications and drug delivery. Ultrafine sized iron particles will be nanocoated with alumina providing film thicknesses of 50, 25, 12.5, 6.3, 3.2, 1.6, and 0.8 nanometers. The partic ...

    STTR Phase I 2003 National Science Foundation
  5. Super-Precision Capacitance Bridge

    SBC: Andeen-Hagerling, Inc.            Topic: N/A

    NIST desires to develop a standard of pressure in the range of 0.3Mpa to 10 Mpa based on measurements of the dielectric constants of gaseous helium and argon. This requires capacitance measurements having a better linearity than can be made with any currently available product. It is proposed that the design of what is currently the most precise commercial capacitance bridge be modified to improve ...

    SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology
  6. SBIR Phase II: The Use of Gestural Interface and Robotics Technology to Facilitate Language Development

    SBC: Anthrotronix, Inc.            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase II project seeks to enhance functionality and clinically evaluate an interactive robotic system to facilitate receptive and expressive language development of children with disabilities. Developed by Anthrotronix, Inc., a rehabilitation engineering, consulting, and product development company, this child-friendly robot is controlled by various ...

    SBIR Phase I 2003 National Science Foundation
  7. SBIR Phase II: The Use of Gestural Interface and Robotics Technology to Facilitate Language Development

    SBC: Anthrotronix, Inc.            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase II project seeks to enhance functionality and clinically evaluate an interactive robotic system to facilitate receptive and expressive language development of children with disabilities. Developed by Anthrotronix, Inc., a rehabilitation engineering, consulting, and product development company, this child-friendly robot is controlled by various ...

    SBIR Phase II 2003 National Science Foundation
  8. Front Turbine Engine Concept

    SBC: AP Solutions, Inc.            Topic: N/A

    This SBIR will determine the feasibility of an innovative gas turbine engine concept which has a turbine in front of the compressor. This engine concept, referred to as the Front Turbine Engine Concept (FTEC), has the potentials for extending the flight speed at which turbomachinery can operate. At hight flight speeds the front turbine extracts sufficient energy from the incoming air thus reducing ...

    SBIR Phase I 2003 National Aeronautics and Space Administration
  9. SBIR Phase I: Development of a Self-Sensing Piezoelectric Actuator

    SBC: B&C Engineering Associates, Inc.            Topic: N/A

    This Small Business Innovation Research Phase I project will develop a self-sensing piezoelectric actuator. The piezoelectric actuator will act at the same time as the sensor that will provide information to the actuators and as its own actuator. No separate sensor is needed. The self-sensing piezoelectric actuator uses an unconventional impedance approach for both dynamic (AC) and static (DC) ...

    SBIR Phase I 2003 National Science Foundation
  10. Highly Reliable LOX Pump for Vehicle Loading Operations

    SBC: Barber-Nichols, LLC            Topic: N/A

    This proposal will present an innovative Phase I research and design plan for a reliable LOX pumping system for use in NASA vehicle loading. Due to seal problems with the current LOX loading pumps, the main focus of the Phase I effort will involve design and development of an innovative sealing solution that does not use a failure prone mechanical seal. The seal solution proposed is a combination ...

    SBIR Phase I 2003 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government