You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Flight Test Development of the X43A-LS Reusable Launch Vehicle
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AAccurate Automation Corporation proposes a three-pronged effort to build on the Phase I program to develop technologies in support of the NASA Hyper-X program and the X-43 series of research vehicles (X-43A, X-43B, and X-43C). The data and technologies developed under the proposed Phase II program will also support the development and testing of future hypersonic vehicles and reusable launch vehic ...
SBIR Phase II 2003 National Aeronautics and Space Administration -
Thermochemical Energy Conversion Engine for Electricity Generation
SBC: Ecotera Energy, Inc. Topic: N/ANASA is interested in the development of highly advanced systems, subsystems and components to enable future robotic and manned missions. A key requirement for these challenging missions will be the development of high efficiency power conversion systems with increased power density. Ecotera Energy proposes an innovative gas turbine improvement, the Thermochemical Energy Conversion (TEC) engine, w ...
SBIR Phase I 2003 National Aeronautics and Space Administration -
Large Area Silicon X-Ray Spectrometer
SBC: IntraSpec Inc Topic: N/AThis project identifies a new approach to silicon x-ray detector technology wherein: (i) the detector geometry is changed to provide a much lower capacitance for a given active area and volume, (ii) the conventional Si(Li) detector is replaced with a stable, oxide-passivated, low leakage-current, deep sensitive-depth, v-type Si element, and (iii) the conventional FET in the preamplifier is replace ...
SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology -
SYSTEMS
SBC: Behavioral Research Assocs Topic: N/ATHIS PROJECT WILL EVALUATE A NEW TYPE OF ALERTING SYSTEM DISPLAY: THE LIKELIHOOD ALARM DISPLAY (LAD). THE LAD FORMS AN OPTIMAL INTERFACE BETWEEN AN INTELLIGENT OR "EXPERT" COMPUTER MONITORING SUBSYSTEMS AND A HUMAN PILOT. IN A LAD DISPLAY, THE ALERTING SIGNAL PROVIDED TO THE HUMAN OPERATOR CONTAINS INFORMATION ABOUT THE COMPUTED LIKELIHOOD OF THE PROBLEM AS DETERMINED BY THE INTELLIGENT AUTOMATED ...
SBIR Phase I 1985 National Aeronautics and Space Administration -
AN ARBITRARY GRID CFD ALGORITHM FOR CONFIGURATION AERODYNAMICS
SBC: Computational Mechan Topic: N/AN/A
SBIR Phase I 1985 National Aeronautics and Space Administration -
BREEDING FACILITIES FOR RODENTS AND AMPHIBIANS IN SPACE
SBC: STAR ENTERPRISES, INC. Topic: N/AN/A
SBIR Phase I 1985 National Aeronautics and Space Administration -
COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.
SBC: Jfb Associates Inc. Topic: N/ACOMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...
SBIR Phase I 1983 Nuclear Regulatory Commission -
ROBOTICS APPLICATION FOR EXPOSURE REDUCTION
SBC: Remotec Inc. Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission