You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Portable Vibrio Cholerae Concentrator for Sensitive Pathogen Detection in Water

    SBC: OMNIVIS INC            Topic: None

    This SBIR Phase I project proposes to develop an easy to use, inexpensive, and portable bacterial concentrator to enable more sensitive cholera pathogen (Vibrio cholerae) detection. Cholera affects communities across 41 countries, including Mozambique in 2019 after Cyclone Idai and Yemen in 2017. Current methods used to detect the cholera pathogen in water involves a 3 to 5-day procedure due to th ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Nanomachine Device for Semiconductor Process Control Monitoring

    SBC: XALLENT INC.            Topic: None

    Conventional characterization and test methods are increasingly ineffective when applied to structures less than 100 nanometers, causing challenges across R&D, process control and failure analysis. An increasing number of subtle defects become prominent drivers of failure as device size and operating margins decrease, e.g., processing anomalies in thin gate oxides, substrate problems related to do ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. DroidChamber

    SBC: ATC-NY INC            Topic: A15058

    Warfighters increasingly rely on mobile devices for voice communication, access to information, and execution of apps that aid them in their tasks. However, untrustworthy applications and risky online behaviors can compromise the mobile device. To be secu

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  4. Next-Generation Adenovirus Vaccine

    SBC: TECHNOVAX INC            Topic: A15051

    1. Produce AdVLP 55 to address the ongoing epidemic of Adenovirus type 55 causing severe pulmonary infections and death in Asia. 2. Establish analytical methods to monitor in-process production control, characterize the final vaccine product, conduct Ad

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  5. MARS Phase II

    SBC: ATC-NY INC            Topic: DHA172004

    System maintenance is time consuming, expensive, and can cause extensive downtime if done improperly. To avoid improper system maintenance, extensive training is often required for existing systems, with additional training required for new capabilities b

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
US Flag An Official Website of the United States Government