You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Production of Pure Magnesium with Green technology from ore Materials-Dolomite and Magnesite

    SBC: CROWN MAGNESIUM INC            Topic: DLA232003

    Magnesium metal, sometimes referred to as the “Green Metal” is important for defense and industrial use, as it is the lightest of all the structural and engineering metals. Magnesium also has superior mechanical properties such as high dampening capacity, heat dissipation, and shock absorbing capacity. Magnesium is 100% recyclable. Due to these factors, magnesium metal is in high demand in the ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  2. CYRIN-OT: Advanced Cyber Range for Operational Technology Digital Twins

    SBC: ATC-NY INC            Topic: DLA232004

    Industrial control system (ICS) operational technology (OT) systems enable increased process efficiency and cost savings.  At the same time, they allow for increasingly complex cyber-attacks with devastating physical impacts.  The ATC-NY team will design and build CYRIN-OT, a system for creating virtual “digital twins” of OT networks and performing security assessments on them.  Any diverge ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Printable Dielectric for Flexible Hybrid Electronics

    SBC: ChemCubed, LLC            Topic: 2

    The goal for this Phase I research is to develop a stretchable dielectric ink that can be used for flexible applications. Printing electronics is a new and quickly growing alternative to traditionally manufactured electronics. Flexible hybrid electronics (FHE) is a novel approach to electronic circuit manufacturing that aims to combine the best of printed and conventional electronics. FHE devices ...

    SBIR Phase I 2023 Department of CommerceNational Institute of Standards and Technology
  4. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. AeroLite Sense: Atmospheric Aerosols and Particulates Observations from the Stratosphere

    SBC: STRATOSOLUTIONS INC            Topic: 91

    The long endurance “StratoSonde” lighter-than-air, uncrewed system combines a low-cost, 5day endurance StratoSonde supports up to 10 micro-dropsondes, which when released from the HAB, descend safely through the entire atmospheric column under a ribbon drogue while reporting observations directly back to the HAB. This project will assess the feasibility of integrating a disposable miniature ae ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets

    SBC: 60Hertz Incorporated            Topic: 92

    This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...

    SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  10. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government