You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Printable Dielectric for Flexible Hybrid Electronics

    SBC: ChemCubed, LLC            Topic: 2

    The goal for this Phase I research is to develop a stretchable dielectric ink that can be used for flexible applications. Printing electronics is a new and quickly growing alternative to traditionally manufactured electronics. Flexible hybrid electronics (FHE) is a novel approach to electronic circuit manufacturing that aims to combine the best of printed and conventional electronics. FHE devices ...

    SBIR Phase I 2023 Department of CommerceNational Institute of Standards and Technology
  2. Power Management for Energy Resiliency

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A224015

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  3. Health Analysis from Vibrational Optical Characterization: HAVOC-Wear

    SBC: Organic Robotics Corporation            Topic: A224025

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  4. Stationary Target Indicator Waveforms for Theoretical Active Electronically Scanned Array Antenna

    SBC: ARTEMIS, INC.            Topic: A214015

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  5. Conformable Hydrogen Storage for Military Applications

    SBC: Noble Gas Systems Inc.            Topic: A234011

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  6. Combat Vehicle Programs: Product Development (PD) Resilience through Set-Based Design Application

    SBC: AGILESYSTEMS LLC            Topic: A19098

    Product development (PD) can be a challenging and unpredictable process, especially when it involves complex and highly engineered programs like those within the Department of Defense (DoD). Traditionally, PD systems have relied on a point-solution design (PSD) approach, which focuses on quickly selecting and pursuing a single solution. While this approach has been widely used, it limits the progr ...

    SBIR Phase II 2023 Department of DefenseArmy
  7. Army Tech Marketplace for Collaborative Innovation

    SBC: TECHNERGETICS, LLC            Topic: A234008

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  8. Army Tech Marketplace

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: A234008

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  9. Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets

    SBC: 60Hertz Incorporated            Topic: 92

    This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...

    SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  10. Vehicle Occupant Verification using Multispectral AI Cameras

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: A214018

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government