You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PROCESSING GRAPHITE WITH PEEK USING A THERMOPLSTIC WELDING HEAD AND THE ROBOTIC WINDING SYSTEM (ROWS)

    SBC: ADC Acquisition Co. dba Automated Dynamics            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  2. CORRELATED RADARS

    SBC: AMERICAN XTAL TECHNOLOGY            Topic: N/A

    THE OBJECTIVE IS TO CREATE A RADAR JAMMING COMPUTER MODEL WHICH EASILY PERMITS ARMY PERSONNEL TO CALCULATE THE JAMMING PARAMETERS WHICH COUNTER BOTH RANGE DELAY AND DOPPLER RADARS. THIS SOFTWARE MUST BE WRITTEN IN BASIC, RUN ON AN MS-DOS COMPUTER AND THE SOURCE CODE SHOULD BE INCLUDED WITH UNLIMITED RIGHTS TO THE GOVERNMENT. KEY OBJECTIVES IN CREATING THIS SOFTWARE ARE AS FOLLOWS: 1) REVIEW EXISTI ...

    SBIR Phase I 1986 Department of DefenseArmy
  3. PC EXPERT SYSTEM/DBMS INTERFACE TOOLS

    SBC: Applied Logic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  4. DISPLACEMENTS

    SBC: Applied Physics Technologies            Topic: N/A

    AN INERTIAL TRACKING SYSTEM, CONSISTING OF SUBMINIATURE LINEAR ACCELEROMETERS AND RATE SENSORS USED TO QUANTIFY THE SIX DEGREE OF FREEDOM RESPONSE OF A RIGID, TEST EQUIPMENT BASED COORDINATE SYSTEM IS DESCRIBED. THIS DATA WILL BE USED TO SUPPLEMENT PRESENTLY OBTAINED PHOTOGRAPHIC INFORMATION. SENSOR REQUIREMENTS ARE OUTLINED IN DETAIL AND APPLICABILITY OF EXISTING INSTRUMENTATION PACKAGES IS DISCU ...

    SBIR Phase I 1986 Department of DefenseArmy
  5. TOXIC CELLULAR DNA DAMAGE AND DISEASES

    SBC: Cytec Inc            Topic: N/A

    THE OBJECTIVE OF THIS PHASE I SBIR PROJECT IS TO STUDY TECHNICAL/ METHODOLOGICAL ASPECTS, PERFORMANCE CRITERIA FOR ANEW CLINICAL SPECIMEN TOXICITY TEST. STATE-OF-THE-ART FLOW CYTOMETRIC/MONOCLONAL ANTIBODY TECHNOLOGY WOULD BE USED TO DETECT DNA DAMAGE, CYTOKINETIC ABNORMALITIES, AND ANEUPLOIDY. GENOTOXICITY AND CYTOKINETIC ABNORMALITIES WOULD BE ASSESSED IN VITRO BY LABELING WITH A HALOGENERATED P ...

    SBIR Phase I 1986 Department of DefenseArmy
  6. MALCH IS A NEW PASSIVE TECHNOLOGY THAT HOLDS THE PROMISE OF ALLOWING CONTROLLABILITY OF THE MAJOR PARAMETERS OF PASSIVE SCATTERS WHETHER DEPLOYED SINGLY AS DECOYS OR IN LARGE CLOUDS AS CHAFF.

    SBC: Descript Co            Topic: N/A

    MALCH IS A NEW PASSIVE TECHNOLOGY THAT HOLDS THE PROMISE OF ALLOWING CONTROLLABILITY OF THE MAJOR PARAMETERS OF PASSIVE SCATTERS WHETHER DEPLOYED SINGLY AS DECOYS OR IN LARGE CLOUDS AS CHAFF. THE CONTROLLABLE DYNAMIC AND ELECTROMAGNETIC PARAMETERS INCLUDE DENSITY OF SCATTERS, SCINTILLATION PROPERTIES INCLUDING POLARIZATION, FALL RATE, CLOUD GROWTH RATE, CENTROID MOTION AND DOPPLER BANDWIDTH.

    SBIR Phase I 1986 Department of DefenseArmy
  7. MULTI-HOLLOW COMPOSITE SHELL BRIDGE DECK

    SBC: U.s. Composites Corp            Topic: N/A

    COMPOSITE MATERIALS OFFER SEVERAL ADVANTAGES OVER METALS FOR PORTABLE BRIDGING: WEIGHT SAVINGS OF 25% OR MORE, CORROSION AND FATIGUE RESISTANCE. THE DESIGN OF A COMPOSITE STRUCTURE IS COMPLEX: COMPOSITE PROPERTIES ARE HIGHLY ANISOTROPIC, MOISTURE ABSORPTION AND TEMPERATURE CHANGES CAUSE CONSIDERABLE STRAINS AND FIT-UP SENSITIVITY IS HIGH. U.S. COMPOSITES WILL DESIGN A COMPOSITE MULTI-HOLLOW BRIDGE ...

    SBIR Phase II 1986 Department of DefenseArmy
  8. LOW-LOSS SAW FILTERS USING MONOLITHIC CONSTRUCTION- DEMONSTRATION

    SBC: Hartmann Research Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  9. MEASUREMENT OF STATIC ELECTRICITY IN FABRICS TEST METHODOLOGY AND APPARATUS

    SBC: I K E Associates Inc.            Topic: N/A

    THIS IS A PROJECT FOR THE DEVELOPMENT OF TEST METHODS TO DETERMINE THE ELECTROSTATIC PROPERTIES OF TEXTILES WHICH CONTAIN A SMALL PERCENTAGE OF CONDUCTIVE FIBERS. THESE FABRICS ARE INTENDED FOR THE MANUFACTURE OF GARMENTS TO BE WORN IN EXPLOSIVE ENVIRONMENTS AND IN OTHER AREAS WHERE THE ACCUMULATION OF STATIC CHARGES MUST BE MINIMIZED. EXISTING COMMERCIALLY AVAILABLE TEST EQUIPMENT WILL BE MODIFIE ...

    SBIR Phase II 1986 Department of DefenseArmy
  10. STUDIES

    SBC: Kld Associates Inc.            Topic: N/A

    AN APPROACH TO THE DESIGN, DEVELOPMENT AND FABRICATION OF A HIGH PRESSURE MICROSCOPE STAGE WITH FACILITIES FOR A TEMPERATURE RANGE OF MINUS 60 DEGREE CENTIGRADE TO PLUS 60 DEGREE CENTIGRADE IS DESCRIBED. THIS DESIGN IS EXPECTED TO ACHIEVE A MAXIMUM PRESSURE OF 20,000 PSI AND REQUIRE A SAMPLE VOLUME OF LESS THAN 100 ULITER. THE USEFUL OPTICAL SPECTRAL RANGE WILL COVER THE VISIBLE TO NEAR INFRARED. ...

    SBIR Phase I 1986 Department of DefenseArmy
US Flag An Official Website of the United States Government