You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Comprehensive Residential Energy Monitoring System
SBC: Physical Optics Corporation Topic: N/ANIST needs a complete residential energy monitoring system to convey real-time comprehensive energy consumption data by particular end-use to occupants. POC developed a new Comprehensive Wireless Residential Energy Monitoring (CORE) system that integrates multiple wireless sensor modes with a unique radio board into an innovative wireless network architecture. Key Phase I developments were a first ...
SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology -
Compact fs Fiber Laser Source for Broadband CARS Microscopy
SBC: POLARONYX INC Topic: N/ABased on our success in developing the world’s first commercial 10 W femtosecond fiber laser system and our leading technology development in ultrashort pulsed fiber laser, PolarOnyx proposes, for the first time, a compact high power dual band integrated fiber laser source. The integrated system will be the first extremely compact comprehensive system to address NIST’s current and future needs ...
SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology -
High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes
SBC: VOXTEL, INC. Topic: N/AA back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...
SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology -
Distributed MBARK Based Mobile Face Recognition
SBC: Ad Harmony Topic: N/APerform a feasibility study on developing a face recognition application in a cloud computing environment utilizing MBARK as the middleware. The application will have a client piece that will run on a mobile device and a server piece that will run on a higher-performance computing cluster. The specific objectives of the feasibility can be enumerated as follows: 1. Split/distribute the MBARK middle ...
SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology -
A Method for Specification of Efficeint and Effective Strategies for Measurement of a Measurement Article on a Coordinate Measuring Machine by Use of Measurement Simulation Techniques
SBC: METROSAGE, L L C Topic: N/AWe propose the definition, design, and prototype development of a software tool for use by the U.S. manufacturing community to enable the automated production of design-based measurement strategies of know reliability and high economic efficiency for coordinate measuring machines (CMMs). The measurement strategies so generated will meet the objective of reducing overall costs to near-minimal value ...
SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology -
Development of Pulse/DC Characterization System for LEDs
SBC: Arroyo Instruments, LLC Topic: N/ADevelopment of LEDs for various applications, such a vehicle lighting, signage, and commercial and residential solid state lighting is progressing at a rapid pace. Various methods exist for measuring the performance of LEDs, but variations in test configurations, thermal management, T&M equipment, and operator experience lead to significant variation in measured performance. The project will desig ...
SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/ATHE PURPOSE OF PHASE I OF THIS RESEARCH PROJECT IS TO CRITICALLY REVIEW THE EXISTING COMPUTERIZED EOP SYSTEMS FOR BOTH PWR AND BWR PLANTS, DEVELOPED BY VARIOUS NATIONAL AND INTERNATIONAL ORGANIZATIONS TO FULLY UNDERSTAND THEIR ADVANTAGES, DISADVANTAGES AND LIMITATIONS IN TERMS OF THEIR IMPACT ON OPERATORS PERFORMANCE AND RELIABILITY AND RECOMMEND ONE SYSTEM OR A COMPOSITE OF SEVERAL SYSTEMS, BEFOR ...
SBIR Phase II 1993 Nuclear Regulatory Commission -
REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACOMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission