You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automatic Dependent Surveillance- Broadcast (ADS-B) and UAS operations

    SBC: KALSCOTT ENGINEERING INC.            Topic: AF171045

    A full-featured ADS-B unit for unmanned air vehicles is proposed. In addition to the ADS-B In/Out capability, several features which are customized for UAV operations are included. In Phase I, development of the features will be undertaken, along with pre

    SBIR Phase I 2017 Department of DefenseAir Force
  2. Synthesis of HAN and HEHN in a Continuous Mix Process

    SBC: Digital Solid State Propulsion, Inc            Topic: AF171061

    Production of hydroxylamine nitrate (HAN) and hydroxyethyl hydrazine nitrate (HEHN) is of great concern for the manufacture of AF-315E. Current stockpiles of heritage ingredients held by AFRL are being depleted and those manufacturers are no longer in exi

    SBIR Phase I 2017 Department of DefenseAir Force
  3. Prediction and Measurement of the Soot Build-Up in Film-Cooled Rocket Engines

    SBC: SIERRA ENGINEERING, INC.            Topic: AF15AT21

    This Phase II STTR effort is focused on generating the data necessary to identify the phenomenology that produces carbon deposition within kerosene film cooled rocket engines.This data is essential to guide the model development and validation process.Program outputs will be both data and a physics-based model for carbon deposition.

    STTR Phase II 2017 Department of DefenseAir Force
  4. Inspection Process Management

    SBC: Aspire Solutions, Inc            Topic: AF083230

    The objective of this proposal is to develop an inspection management tool that standardizes both the inspection process and the inspection data.  The Oklahoma City Air Logistics Center (OC-ALC) current processes are manual, paper based methods that rely heavily on the individuals experience to properly identify the defect and log it.  This research would create a tool that would improve the ins ...

    SBIR Phase I 2009 Department of DefenseAir Force
  5. Photonically-Controlled SiC based Device Technology for Power Electronic Applications

    SBC: Arkansas Power Electronics International, Inc.            Topic: AF083110

    This Small Business Innovation Research Phase I project seeks the development of an optically-triggered silicon carbide based power device technology that will enable the next-generation of EMI/EMP-resistant power electronics systems and ultimately the implementation of advanced concepts such as Fly-by-light (FBL).  To develop the proposed technology Arkansas Power Electronics International, Inc. ...

    SBIR Phase I 2009 Department of DefenseAir Force
  6. Very Low Profile Non-Intrusive Data Acquisition Systems for Turbine High Temperature Bearing Sensors

    SBC: Arkansas Power Electronics International, Inc.            Topic: AF073040

    The terminal objective of this Phase II work will be the development of a harsh environment non-intrusive self-powered wireless sensor-transmitter capable of operation to 225 °C and survivable to 300 °C. The developed wireless sensor transmitter will acquire bearing parametric data, such as temperature and vibration information, and wirelessly transmit that data to an engine PHM system. The el ...

    SBIR Phase II 2009 Department of DefenseAir Force
  7. Replacement for Hexavalent Chromium Conversion Coatings for Magnesium and Zinc-Nickel

    SBC: METALAST INTERNATIONAL, INC.            Topic: AF083226

    The European Union''s RoHS and WEE Directives mandated the elimination of the carcinogenic, hexavalent chromium coatings for metals, including magnesium and zinc-nickel plated substrates.  The purpose of this project is to find chemistry that will meet requirements of industry performance specifications and of the mandate.  METALAST intends to explore trivalent chromium in conjunction with two o ...

    SBIR Phase I 2009 Department of DefenseAir Force
  8. Optical Switching Fabric

    SBC: OPTICOMP CORP.            Topic: AF083209

    The major requirements for this program include the modeling of optical switching fabric technologies appropriate to space-borne systems at very high speed. Specifically, this program will evaluate two OptiComp candidate optical transceiver technologies against a Serial Rapid IO switching fabric. A down-selection to one optical transceiver technology will be made. Then, a simulation of that Serial ...

    SBIR Phase I 2009 Department of DefenseAir Force
  9. Terabit Per Second Optical Router for Space-Based Satellite Network

    SBC: OPTICOMP CORP.            Topic: AF083191

    The major requirements for this program include the modeling of optical routing technologies appropriate to space-borne systems at very high speed. This program will investigate optical routing at speeds to from 3.125 ro 10 Gbps per channel, with a wavelength/channel density from 4 to 16 wavelengths. Models will be constructed for these regimes, and an experimental demonstration of an 8-wavelength ...

    SBIR Phase I 2009 Department of DefenseAir Force
  10. Novel Manufacturing Process of Optoelectronic Transceiver Technology

    SBC: OPTICOMP CORP.            Topic: AF083152

    The proposed program will develop OptiComp''s coarse WDM transceiver manufacturing technology.  This WDM optical transceiver technology is highly novel, emphasizing manufacturability, ruggedization, modularity, ease of upgrade and qualification, extensive built-in diagnostic monitoring and test capabilities, as well as superior performance with reduced manfacturing complexity.  The modular desig ...

    SBIR Phase I 2009 Department of DefenseAir Force
US Flag An Official Website of the United States Government