You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Cost Estimating Methodology for Advanced Air Vehicles

    SBC: Frontier Technology Inc.            Topic: N/A

    Historically, the Air Vehicle Technology industry has developed technologies based upon performance and, to a much lesser extent, the cost of individual technologies. The public and government will no longer justify and support these costs inlight of a perception that the enemy has been defeated. Emphasis of Science and Technology efforts must now be on system affordability. Further "gray beard ...

    SBIR Phase II 1998 Department of DefenseAir Force
  2. User Definable 4-D Common Operating Picture (COP)

    SBC: THE DESIGN KNOWLEDGE COMPANY LLC            Topic: AF073010

    The Design Knowledge Company will transition its STEED work-centered support environment to the support of Air Operations Centers.  We will build on current User-Definable Operational Picture work as well as other R&D efforts.  We will introduce innovative navigation, display, and integration concepts, each tailorable to the role of the individual operator.  It provides a net-centric, cross-pla ...

    SBIR Phase II 2009 Department of DefenseAir Force
  3. Ambient Light Control Using Guest Host Liquid Crystal-Dye Systems

    SBC: ALPHAMICRON, INCORPORATED            Topic: N/A

    Continuous attenuation of ambient light without image distortion is of great importance in helmet mounted displays. To accomplish this, we propose a device based on liquid crystal-dichroic dye mixture. The system is electrically controllable, light weight, with full grey scale capability for all light conditions. It addresses all of the requirements and restrictions of visor based helmet mounte ...

    SBIR Phase II 1998 Department of DefenseAir Force
  4. Method for RF Scene Projection for Use in Radar Countermeasures Assessment

    SBC: MATRIX RESEARCH INC            Topic: AF081079

    In this effort Matrix Research and Engineering proposes to research and demonstrate methods for utilizing an active electronically scanned array along with an appropriate reflector to implement a radio frequency scene projector that will allow users to present various simulated targets to an aperture under test. The system builds on algorithms developed in our Phase I effort that allow us to speci ...

    SBIR Phase II 2009 Department of DefenseAir Force
  5. The Field Programming Station- Quick- Turn Multichip Module (MCM) Creation at the Customer Site

    SBC: PICO SYSTEMS, INC.            Topic: N/A

    MCMs represent a major improvement in advanced electronic packaging. Pico Systems serves the MCM market with a programmable substrate technology which avoids the need for a customized MCM substrate. This is attractive for prototyping and low volumes since it minimizes non-recurring costs and lead times. Key components are a combination of software and equipment used to customize substrates to s ...

    SBIR Phase II 1998 Department of DefenseAir Force
  6. Wireless Fire Detector Phase II

    SBC: NEW WAY SOLUTIONS, LLC            Topic: AF073130

    The purpose of this Phase II project is to design, manufacture, test and deliver an innovative rapid Wireless Fire Detection (WFD) system based on a successfully demonstrated Phase I prototype. This Phase II SBIR will produce a highly reliable, rapid response, low-cost, lightweight, wireless Flame Sensor Module (FSM) and Receiver Module (RM) that operate in both future and legacy aircraft environm ...

    SBIR Phase II 2009 Department of DefenseAir Force
  7. Space Weather Integration Fusion Technology (SWIFT)

    SBC: THE DESIGN KNOWLEDGE COMPANY LLC            Topic: AF081017

    The Design Knowledge Company (TDKC) is pleased to present this Phase II Small Business Innovation Research (SBIR) proposal titled, Space Weather Integration Fusion Technology (SWIFT).  Our proposed Phase II approach is focused on supporting AFRL with its mission of researching and developing space situation awareness (SSA) technologies and tools that provide the important space weather dimension ...

    SBIR Phase II 2009 Department of DefenseAir Force
  8. Towards Total Spectrum Dominance: Multi-carrier Based Cognitive Radio and Cognitive Jamming for Electronic Warfare Countermeasures

    SBC: MRLETS TECHNOLOGIES, INC.            Topic: AF073070

    The objective of this Phase II project is to design, implement and demonstrate an innovative secure cognitive wireless communication/jamming system. This system will integrate multiple advanced signal processing, communication and electronic warfare countermeasure technologies together to create total spectrum dominance for military applications. The proposed cognitive communication/jamming system ...

    SBIR Phase II 2009 Department of DefenseAir Force
  9. Collaborative Engineering Real Time Data Base Correlation Tool

    SBC: Defense Research Associates, Inc.            Topic: N/A

    The objective of this effort is to define key technical requirements, identify enabling technologies, conduct technology experiments, develop a system specification, provide an implementation approach, and develop a demonstration plan for a Collaborative Engineering Real Time Database Correlation Tool to support the development and correlation of databased required for the success of a collaborati ...

    SBIR Phase II 1998 Department of DefenseAir Force
  10. Fiber-Optic RF Distribution (FORD) & Digital Control Signals Network Across a PCB in GPS User Eqpt

    SBC: Nu Waves Ltd.            Topic: AF081082

    High performance RF circuits found in highly robust GPS user equipment are especially sensitive to inter-board electromagnetic interference, which results in spurious signals and poor circuitto-circuit isolation.  NuWaves innovative solutions will be applied to designing and developing state-of-theart miniature Fiber Optic RF Distribution (FORD) and Digital Control Signals Network (DCSN)modules. ...

    SBIR Phase II 2009 Department of DefenseAir Force
US Flag An Official Website of the United States Government