You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Seat/Bolster/Other

    SBC: ACTIVE SHOCK, INC.            Topic: N/A

    "A shock mitigating suspended seat which places the Special Forces Operator in an optimal ergonomic position will be developed for use in small Maritime Combatant Craft. It will feature an actively controlled shock absorber to optimize the suspension for abroad range of operator weights and sea states. In Phase I, a conceptual design of all the major components as well as the architecture for bo ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  2. Development of Frequency Hopper/DSSS Detection Algorithms

    SBC: Herrick Technology Laboratories Inc.            Topic: N/A

    "Development of detection and demodulation algorithms for selected DS spread spectrum emitters and perform laboratory testing of the algorithm against a simulated operational environment. Development of a software solution to the threat signals currentlyonly addressed with special purpose hardware. Incorporation planned into the DRT family of hardware receivers."

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  3. A Low-Cost In-flight Deicing System for Aircraft

    SBC: CREARE LLC            Topic: N/A

    The proposed innovation is a deicing system for aircraft leading edges using a high-efficiency, electrically actuated thin-film elastomer. The entire aircraft industry needs this technology to improve safety while minimizing the overall impact on aircraft weight and fuel consumption. We propose to use a low-cost, electrically actuated thin-film elastomer to break the ice bond in a manner similar ...

    SBIR Phase I 2002 Department of Transportation
  4. Reduction of Motion Side Effects and After Effects

    SBC: CREARE LLC            Topic: N/A

    "Motion sickness has long been a problem during the deployment of military forces. The increased speed and agility of today's transports makes this problem even more acute. For the special forces who undertake rapid insertions using a variety of vehiclesin all weather, the incidence of motion sickness can compromise the mission and endanger lives. Despite intensive research, there are still no ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  5. An Autorotating Air Cargo Delivery System

    SBC: CREARE LLC            Topic: N/A

    A precision air-drop capability is required to allow the re-supply of Special Operations Forces (SOF) behind enemy lines. The covert nature of these operations makes it important that the drop occur with low visibility. Furthermore, a wide range of dropparameters will give the drop-aircraft the freedom to avoid detection. Creare proposes a novel AutoRotating Air Delivery System (ARADS) that wil ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  6. A Posture Awareness Training Suit

    SBC: CREARE LLC            Topic: N/A

    "Special forces personnel are often subjected to physically abusive conditions during transit to and from operation sites. At best, these conditions result in accelerated fatigue and reduced mission performance, and at worst, in injuries such as musclestrain or stress fractures. It is our hypothesis that by maintaining optimal body postures during transit, the net shock levels on muscles and bon ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  7. JP-8 Micro-reformer

    SBC: PRECISION COMBUSTION, INC.            Topic: N/A

    "PCI proposes into topic Area 2 to develop and demonstrate a JP-8 micro-reformer capable of delivering the hydrogen required for a 20 We Solid Oxide Fuel Cell (SOFC) from a catalytic reactor which is expected to be ~1 in3 (size of 2 standard AA batteries)and weighing

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  8. Data Mining for Early Identification of Critical Events/Conditions in Medical Logistics

    SBC: PREMISE DEVELOPMENT CORP.            Topic: N/A

    "The primary objective of this proposal is to identify critical data mining and analytical tools and emerging technologies and methodologies that can be used to improve the entire military medical logistics/supply chain management. In addition, as part ofthis research and analysis, Premise Development Corporation will demonstrate the feasibility of creating modern and user-friendly "dashboards" ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  9. SOF Critical Care Medical Tools

    SBC: RESTORE MEDICAL, INC.            Topic: N/A

    "When military personnel are assigned to remote locations, are in combat, and are without a medic, the need for a lightweight and reliable system that stabilizes the airway following trauma is critical. Utilizing our unique understanding of airwaycompromise, we propose to design a system that can be used to establish an airway successfully and quickly in an unconscious person with an obstructed a ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  10. Portable Wireless Monitoring Station

    SBC: Sonetech Corp.            Topic: N/A

    "The project can be described as a research effort that will result in a robust design of a next generation Portable Wireless Monitoring Station for SOF tactical users. The design will fully exploit current COTS equipment while new approaches will bedeveloped as needed. The phase one effort is a four-month effort. The work is divided into 5 major tasks: 1) Requirements Analysis - What do the us ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government