You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Low-Cost In-flight Deicing System for Aircraft

    SBC: CREARE LLC            Topic: N/A

    The proposed innovation is a deicing system for aircraft leading edges using a high-efficiency, electrically actuated thin-film elastomer. The entire aircraft industry needs this technology to improve safety while minimizing the overall impact on aircraft weight and fuel consumption. We propose to use a low-cost, electrically actuated thin-film elastomer to break the ice bond in a manner similar ...

    SBIR Phase I 2002 Department of Transportation
  2. Reduction of Motion Side Effects and After Effects

    SBC: CREARE LLC            Topic: N/A

    "Motion sickness has long been a problem during the deployment of military forces. The increased speed and agility of today's transports makes this problem even more acute. For the special forces who undertake rapid insertions using a variety of vehiclesin all weather, the incidence of motion sickness can compromise the mission and endanger lives. Despite intensive research, there are still no ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  3. JP-8 Micro-reformer

    SBC: PRECISION COMBUSTION, INC.            Topic: N/A

    "PCI proposes into topic Area 2 to develop and demonstrate a JP-8 micro-reformer capable of delivering the hydrogen required for a 20 We Solid Oxide Fuel Cell (SOFC) from a catalytic reactor which is expected to be ~1 in3 (size of 2 standard AA batteries)and weighing

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  4. Data Mining for Early Identification of Critical Events/Conditions in Medical Logistics

    SBC: PREMISE DEVELOPMENT CORP.            Topic: N/A

    "The primary objective of this proposal is to identify critical data mining and analytical tools and emerging technologies and methodologies that can be used to improve the entire military medical logistics/supply chain management. In addition, as part ofthis research and analysis, Premise Development Corporation will demonstrate the feasibility of creating modern and user-friendly "dashboards" ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  5. Diode Laser-Based Ketosis Sensor

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    This Small Business Innovation Research Phase I proposal will lead to the development of a sensor for detection of the early onset of ketosis by breath acetone measurements. The device will be hand-held, lightweight, and battery-powered. Near-infrareddiode laser measurement of a gas-solid reaction product of acetone will afford increased sensitivity. The sensor will provide a rapid measurement ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  6. Portable PEM Fuel Cell Using Low Cost Pseudo Catalyst Electrodes

    SBC: US NANOCORP, INC.            Topic: N/A

    "DOD seeks compact and lightweight portable fuel cell systems for communication, computation, and sensors, with a 20W power requirement. US Nanocorp proposes to demonstrate the feasibility of exploiting a member electrode assembly ("MEA") using low costpseudo-catalyst electrodes for portable proton exchange membrane fuel cells ("PEMFCs"). An MEA in a conventional PEMFC stack uses a Nafion proton ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  7. Advanced Nickel-Metal Hydride Battery

    SBC: Mobile Energy Products, Inc.            Topic: N/A

    Many DOD systems employ rechargeable batteries to supply power. Battery weight, volume, cycle life and cost are generally limited considerations in enabling satisfactory mission performance. Systems presently utilize Lead-Acid, Nickel-Cadmium, Nickel-Metal Hydride or Lithium-Iobatteries. The Nickel-Metal Hydride (Ni-MN) system is now under study as a superior candidate for many applications. El ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  8. Cost effective, rapid densification of lightweight ceramic matrix composite LRE components by gas phase reaction synthesis

    SBC: EXOTHERMICS, INC.            Topic: N/A

    Sabulon, Inc. has developed novel and rapid gas phase nitridation methods which have considerable potential for manufacturing rocket nozzle components from structurally robust and thermally stable silicon-based CMC materials in more cost-effective and rapid fashion than currently available chemical capor infiltration or polymer impregnation and pyrollysis processing techniques. This proposal advo ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  9. Heterostructure Acoustic Charge Transport (HACT) Spatial Light Modulators (SLMs) for 3-D Parallel Optical Memory Interconnects

    SBC: Materials Technologies Corporation            Topic: N/A

    This proposal focuses on the development of heterostructure acoustic charge transport (HACT) Spatial Light Modulator (SLM) structures, which potentially address a larger number of pixels with substantially fewer interconnects, as input and output devices for a 3-D volume optical memory. Unlike other types of SLMs, HACT addressing of a 10(6) pixel array requires only 3x1024 interconnects in place ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  10. Haptic Display Software for Hiqh Level Architecture Simulations

    SBC: CREARE LLC            Topic: N/A

    Future High Level Architecture (HLA) simulations will incorporate non-visual stimuli. One such stimulus will be force feedback that is provided using haptic displays. Force feedback will be instrumental in o btaining high fidelity information exchange between the simulation and the user. However, one significant problem with providing force feedback between a simulation and a user is that time ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government