You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Edge AI Enabled Detection & Autonomous Tracking of Vehicles from a Rucksack Portable Fixed-Wing sUAS
SBC: WINGXPAND INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Rapid Terrain/Map Generation for Robotic and Autonomous Vehicle Simulations
SBC: LICKENBROCK TECHNOLOGIES, INC. Topic: A20129The objective of this project is to build 3D terrain models from satellite imagery and Digital Elevation Maps (DEM) using the Unreal Engine platform. Terrain and other objects are added to the 3D model by classifying objects from RGB satellite images. The classification of objects is typically the most time-consuming step within the entire process, which is currently done manually by a user. In P ...
SBIR Phase I 2021 Department of DefenseArmy -
Using Connected Play To Engage Learners In Computational Thinking Practices Through Collaborative Problem Solving
SBC: MAKEFULLY LLC Topic: 91990020R0006This project will develop a prototype that extends Makefully, a collaborative digital and physical multi-player puzzle-solving board game for math and computer science, with a focus on integrating music. The Phase I prototype will include additional physical and digital play modules and an adaptive component that provides feedback to students as they progress through the game to inform their learn ...
SBIR Phase I 2020 Department of EducationInstitute of Education Sciences -
Compact Thermal Solutions through Additive Manufacturing Techniques
SBC: THERMAVANT TECHNOLOGIES LLC Topic: A20007Under this proposed Phase I SBIR effort, ThermAvant Technologies (ThermAvant) shall design, model, prototype and analyze the thermal performance of landscaped heat sinks with integral oscillating heat pipes (OHP) and phase change material (PCM) reservoirs (collectively, OHP/PCM). Prototype OPH/PCM heat sinks shall demonstrate their unique potential to acquire, rapidly spread and isothermally store ...
SBIR Phase I 2020 Department of DefenseArmy -
Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply
SBC: LOKI INC Topic: A19081The objective of this Phase II effort is to create new single use power supplies as the prime electrical sources for radio frequency transmitters installed in guided multiple launch rocket systems or 155 mm rounds, per the A19-081 Topic description. These power supplies may be reused if required. According to the Topic, in the Phase II program the power supply: Is to produce 500 kV of output volta ...
SBIR Phase II 2020 Department of DefenseArmy -
Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply
SBC: LOKI INC Topic: A19081The overall technical objective of the phases of this effort, as stated in the solicitation, is to design and construct compact non-explosive power supplies that can be used to power HPM systems, and to conduct proof-of-principle demonstrations of those supplies. The main goal of our Phase I effort is to determine the technical feasibility of each of our proposed concepts early in the Phase, and t ...
SBIR Phase I 2019 Department of DefenseArmy -
Dual-Voltage Lithium-Ion 6T Batteries for Low-voltage and High-voltage Applications
SBC: SPEAR POWER SYSTEMS, INC Topic: A18096The development of a modular, scalable battery system designed to support the Army’s 6T program will substantially reduce life cycle costs to the Army and DoD at large. Spear’s VoltFlex permits 6T lithium ion batteries to operate in either 24V or 48V modes. Spear’s novel switching mechanism identified in Phase I, will be further refined in Phase II and used in conjunction with the 24V and 48 ...
SBIR Phase II 2019 Department of DefenseArmy -
Development of a Rapid Monitoring System for Detection of Pathogens in Marine Aquaculture Operations
SBC: INNOVAPREP LLC Topic: 836TECHNICAL ABSTRACT: InnovaPrep proposes to develop a rapid sample-to-answer monitoring system for detecting pathogens in marine aquaculture waters. An assessment of industry needs will include a kickoff meeting with NOAA and a visit to Toby Island Bay Oyster Farm. Following the assessment and report, a TRL-4 breadboard prototype system will be developed that will include the combination of sample ...
SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration -
Dual-Voltage Lithium-Ion 6T Batteries for Low-voltage and High-voltage Applications
SBC: SPEAR POWER SYSTEMS, INC Topic: A18096Spear Power Systems will leverage their strong experience developing advanced lithium-ion battery systems and robust battery management systems for defense and industrial programs to research and evaluate viable lithium-ion cell technologies and emerging power-dense semiconductor switch technologies to support an innovative dual-voltage lithium-ion 6T concept design. During Phase I, Spear will mak ...
SBIR Phase I 2018 Department of DefenseArmy -
Radiolytic Atomic Cell for Long-Lived Sensors
SBC: INFINITY POWER LLC Topic: A15018Infinity Power will carry out a well-defined research plan and activities for the successful transition of a conceptual device in Phase I into a potentially viable commercial prototype. The proposed Phase II project will provide an advanced development of new atomic cells for Armys applications. As we successfully accomplished goals in Phase I, our technology seems very promising. Throughout the P ...
SBIR Phase II 2017 Department of DefenseArmy