You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Location-based Weather Threat Tracking and Notification System

    SBC: CFD RESEARCH CORPORATION            Topic: 834

    TECHNICAL ABSTRACT: CFDRC proposes the creation of an innovative location-based threat tracking and notification system to allow users to receive hazardous weather messages from the NWS with their call to action, allow users to receive custom-tailored messages about threats, and visualize relevant weather information within their area. The focus is on a tool that allows this information to be comm ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  4. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  6. Kappler SBIR-2012.2-005 Phase II

    SBC: KAPPLER INC            Topic: HSB0122005

    Kappler proposes to further define and develop a novel fabric composite that when integrated into Personal Protective Equipment (PPE) garments, provides protection to the wearer from multiple threats. The proposed research builds on the strength of the Phase I effort where Kappler validated the base fabric's capability to protect from chemical, biological, and flame hazards, and simultaneously be ...

    SBIR Phase II 2013 Department of Homeland Security
  7. Geospatial Underground Tracking Solution (GUTS)

    SBC: Q-Track Corporation            Topic: HSB0101006

    The problem of accurate, reliable location in GPS denied areas is acute especially in the context of tunnel interdiction efforts at the US borders. Conventional technologies such as LORAN or inertial guidance methods are ill suited to the problems encountered in an underground environment. QTrack has developed a suite of geolocation solutions that are capable of providing better than 1m tracking m ...

    SBIR Phase I 2010 Department of Homeland Security
US Flag An Official Website of the United States Government