You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Location-based Weather Threat Tracking and Notification System

    SBC: CFD RESEARCH CORPORATION            Topic: 834

    TECHNICAL ABSTRACT: CFDRC proposes the creation of an innovative location-based threat tracking and notification system to allow users to receive hazardous weather messages from the NWS with their call to action, allow users to receive custom-tailored messages about threats, and visualize relevant weather information within their area. The focus is on a tool that allows this information to be comm ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Immobilized Enzyme Additive Package for Plant-Based Finfish Aquaculture Feed

    SBC: Guild Associates, Inc. DBA Guild Biosciences            Topic: 835

    TECHNICAL ABSTRACT: A cost-effective, nutritious feed that minimally impacts the surrounding environment is critical to the profitability of a commercial aquaculture operations. As common sources of protein, such as fishmeal and fish processing byproducts, are becoming limited and more expensive to use, feed producers have turned to plant-based proteins. Plant-based feeds however, come with their ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Additive Manufacturing Sensor Fusion Technologies for Process Monitoring and Control.

    SBC: ARCTOS Technology Solutions, LLC            Topic: DLA18A001

    Universal Technology Corporation (UTC) has teamed with the University of Dayton Research Institute (UDRI), Stratonics, and Macy Consulting to demonstrate not only the transitionability into commercial systems, but also to develop the data analytics and monitoring and control requirements to extract the full value fromseveral sensors, including the Stratonics ThermaViz, acoustic and profilometry se ...

    STTR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: ARCTOS Technology Solutions, LLC            Topic: DLA181002

    This project aims to make Laser Powder Bed Fusion (LPBF) additive manufacturing a practical tool for supply chain management for the Defense Logistics Agency.The key step is developing process standardization to make LBPF quality vendor independent. This project will seek to demonstrate the use of a promising high speed melt pool monitoring device as a practical means to establish such process sta ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government