You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Synthetic EO/IR Image Generation for Computer Vision/ATR
SBC: THERMOANALYTICS INC Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Strengthening Supply Chain Resilience Through Automated Data Labeling and Predictive Analytics
SBC: R4 TECHNOLOGIES, INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
r4 Dynamic Tours: Predictive Perimeter Defense to Enhance Threat Detection and Prevention
SBC: R4 TECHNOLOGIES, INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Structurally Jointed Domestic Hardwood Lumber with Enhanced Durability for Trailer Decking
SBC: SUPERIOR SUSTAINABLE SOLUTIONS LLC Topic: A224014Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Insole-based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance with GPS Denied Tracking Capablities
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Online and Offline Terrain Strength Estimation Using Remote Sensing for Ground Vehicle Mobility- Phase II
SBC: MTRI INC Topic: A21CT021NATO is currently developing the Next-Generation Reference Mobility Model (NG-NRMM), which is used to determine terrain strength properties for mobility. The NG-NRMM relies heavily on in-situ measurements, which is a significant limitation for traversing unknown areas and combat zones. The MTRI Inc. and MTU team recently competed the A21C-T021 Phase I Small Business Technology Transfer (STTR) proj ...
STTR Phase II 2023 Department of DefenseArmy -
TRL Advancement and Expeditionary Additive Construction System for MASh Kit
SBC: GEOFABRICA INC Topic: A22013In this Phase I SBIR, Geofabrica Inc. will advance the Modular Assembly Shelter (MASh) Kit technology developed by U.S. Army’s Construction Engineering Research Laboratory (ERDC-CERL) engineers. (MASh) Kit that leverages pre-engineered construction, additive construction and 3D printing techniques. The company will develop the foundations for a method for fabricating MASh Kit components using 3D ...
SBIR Phase I 2023 Department of DefenseArmy -
Enzyme Fuel Cell Power Generation System
SBC: ELECTRIC DRIVETRAIN TECHNOLOGIES LLC Topic: A224019Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Conformable Hydrogen Storage for Military Applications
SBC: Noble Gas Systems Inc. Topic: A234011Redacted
SBIR Phase II 2023 Department of DefenseArmy