You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Sustainable Geopolymer Concrete (GPC) using Indigenous and Waste Materials

    SBC: HIFUNDA LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  2. Seaweed-based bioplastic replacement for commercial lobster fishing gear.

    SBC: VIABLE GEAR LLC            Topic: 93

    Viable Gear will provide proof-of-concept for a seaweed-based bioplastic to be used in manufacturing a compostable biotwine for marine equipment, designed to replace petroleum-based plastics. This addresses NOM-SBIR research topic area 9.3, The Changing Ocean - specifically to "support increased protection and restoration of marine and coastal habitats to enhance vital ecosystems", by helping decr ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Army Tech Marketplace

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: A234008

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  4. Synthetic EO/IR Image Generation for Computer Vision/ATR

    SBC: THERMOANALYTICS INC            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  5. Strengthening Supply Chain Resilience Through Automated Data Labeling and Predictive Analytics

    SBC: R4 TECHNOLOGIES, INC.            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  6. r4 Dynamic Tours: Predictive Perimeter Defense to Enhance Threat Detection and Prevention

    SBC: R4 TECHNOLOGIES, INC.            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  7. Improve Group Response to A234-005- Holistic Health and Fitness Readiness Kit

    SBC: Improve Group, Inc.            Topic: A234005

    This effort is more than just a facility innovation question. It is existential to the Army’s preparation for the future fight.  SPRC’s can’t just be a new evolution of fitness facility, but they must meet new soldiers where they are, and lead them to their potential as soldiers.  The right SPRC program will affect recruiting and retention, and ultimately the Army’s global force generati ...

    SBIR Phase I 2023 Department of DefenseArmy
  8. Solid-State Cooling System Utilizing Ionic Liquid Heat Transfer

    SBC: CONNECTICUT ANALYTICAL CORPORATION            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  9. Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance

    SBC: NANO COMPOSITE PRODUCTS, INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  10. Large-scale Additive Manufacturing R&D to Advance Modular Shelter Design and Deployment

    SBC: Compotech, Inc.            Topic: A22013

    Shelter system technologies provide vital support to U.S. military personnel during in-theatre operations and peace-time continuity. Soldiers, logistics experts, and decision makers across the chain of command require shelter systems that perform in austere environments while also being cost-effective, resilient, durable, and easily maintained. For land-based conflicts in more remote locations and ...

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government