You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Energy Density Batteries

    SBC: WASATCH IONICS LLC            Topic: SOCOM232003

    Soldiers conducting missions on foot in remote locations must carry multiple battery powered electronic devices, such as multiband radio sets, night vision goggles and scopes, GPS tracking, thermal imagers, target designators, etc. These devices allow soldiers to target, move, and communicate in the modern battlefield. Depending upon the type of mission and its duration, soldiers might not have th ...

    SBIR Phase I 2023 Department of DefenseSpecial Operations Command
  2. Seaweed-based bioplastic replacement for commercial lobster fishing gear.

    SBC: VIABLE GEAR LLC            Topic: 93

    Viable Gear will provide proof-of-concept for a seaweed-based bioplastic to be used in manufacturing a compostable biotwine for marine equipment, designed to replace petroleum-based plastics. This addresses NOM-SBIR research topic area 9.3, The Changing Ocean - specifically to "support increased protection and restoration of marine and coastal habitats to enhance vital ecosystems", by helping decr ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. TEAMS Fault Management Extension for State-based Design and Simulation

    SBC: QUALTECH SYSTEMS, INC.            Topic: S17

    Reliable Vamp;V and testing of fault management (FM) during design, implementation and operations is an essential part of systems engineering design and development of critical space programs such as the SLS, Gateway and Artemis.nbsp;NASArsquo;s Mission and Fault Management group currently utilizes SAM to assess nominal andnbsp;FM algorithms prior to full-scale real-time testing, to proactively ch ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  4. Radar Vision Systems for Enhanced Robotic Mobility, Precise Navigation, and Multi-Vehicle Coordination

    SBC: ALOFT SENSING INC            Topic: S13

    Aloft Sensing Inc. (Aloft) proposes to adapt and establish the feasibility of our scalable Radar Vision Systems (RVS) for operation on solar system bodies. RVS consist of state-of-the-art multichannel mm-wave radars coupled with our patent-pending position, navigation, and timing algorithms (AloftPNT). Demonstrated through simulations and field experiments, these systems achieve both accurate self ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  5. Collaborative Multidimensional Trade Space Analysis Capability

    SBC: SYSTEM STRATEGY INC            Topic: S17

    The Collaborative Tradespace Capability (CTC) prototype proposed by the SSI team is designed to address critical areas of interest to NASA, such as improving model interoperability, managing varying levels of fidelity/uncertainty, and rapidly and iteratively operating across a distributed collaborative environment to characterizenbsp;and selectnbsp;optimum candidates. The goal of the Phase I proje ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  6. Rapid Integration of Disparate Data Assets for Space Weather Research and Operations

    SBC: MEROXA INC            Topic: S14

    In Phase I, Meroxa proposes to demonstrate the technical feasibility of building accessible tooling and connectors (proof of concept) for NASA to move space weather data, regardless of format and location, to any destination in the format required and in real-time.

    SBIR Phase I 2023 National Aeronautics and Space Administration
  7. Expeditionary BVLOS Infrastructure and UTM for Airborne Wildfire Response

    SBC: ANZEN UNMANNED, LLC            Topic: A3

    Current aerial wildfire management is limited by existing operational limitations imposed by regulations and manual airspace management techniques, preventing integration of new aircraft types such as UAS. Core issues preventing optimal use of the wildfire response airspace are:Lack of integrated planning and deconfliction between manned aircraft and UASLack of manned aircraft situational awarenes ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  8. Solar Powered Rocket with Impulsive Thermal Engine (SPRITE)

    SBC: THERMASAT, INC.            Topic: Z8

    The Solar Powered Rocket with Impulsive Thermal Engine (SPRITE) combines the high performance of a nuclear thermal rocket with the simplicity of solar thermal propulsion. The system operates by collecting solar power and storing energy in a high temperature phase change material. This allows the SPRITE to minimize solar collector area by gathering energy over a period of time and releasing it quic ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  9. Lunar Extreme Water Container (LEWC)

    SBC: MOONPRINT SOLUTIONS LLC            Topic: Z13

    NASA is developing in situ water retrieval technologies to excavate regolith-based water deposits from various regions on the lunar surface, then transport, store, and process them into potable water, propellant, fuel cell reactants, and life support consumables for Artemis missions. Part of this logistics chain is a collapsible water container that can operate in harsh environments such as lunar ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  10. P23-014 Co-design of Shared Tasking with human and Autonomous Robot teams (Co-STAR)

    SBC: SOAR TECHNOLOGY INC            Topic: Z5

    Space operations are undergoing a paradigm shift towards persistent assets in space, supported by coordinated, adjustable human-robot partnerships. Such partnerships require enabling technologies which can: support co-design of reference missions, partner robots and novel human-robot teaming paradigms to assist in integrated mission planning and execution. To address these challenges, SoarTech, al ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government