You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Instrumented Projectiles for Measuring Impact Forces to Characterize Ballistic Behavior of Fabrics and Composites

    SBC: LIUMAN TECHNOLOGIES            Topic: A11011

    In order to simulate the high velocity involved in ballistic impacts, at least up to some extent, laboratory used gas guns have been developed for material and structure testing. However, if the projectiles of the guns are not instrumented, they cannot provide information concerning impact mechanisms and damage processes during impacts. In an effort to improve their measuring capability, accelerom ...

    SBIR Phase I 2011 Department of DefenseArmy
  2. Small Diesel Engine for Modular Power

    SBC: D-Star Engineering Corporation            Topic: A11068

    The project aims to engage in design, modeling and simulation of a heavy fuel engine that meets the specific needs of the Army (300 500 Watts of rated mechanical power). Phase 1 tasks include definition of an engine that can meet the power needs, parametric design of the engine, engine modeling, variational performance analysis & optimization, prediction of engine performance, optimization of the ...

    SBIR Phase I 2011 Department of DefenseArmy
  3. Power Control Solution for Electrical System Improvements

    SBC: GLOBAL EMBEDDED TECHNOLOGIES, INC            Topic: A11062

    The U.S. Army is seeking ways to improve mission capability of small Autonomous Unmanned Ground Systems (AUGS) power systems. The challenges with AUGS stem from proprietary nature of information and control of vehicle platforms. The proprietary information is important for robot manufacturers because of investments that are made to develop technology advantages over competition in their base rob ...

    SBIR Phase I 2011 Department of DefenseArmy
  4. Loc's Maximum Torque Quick Disconnect (MaxTorQD) Bradley Final Drive

    SBC: LOC PERFORMANCE PRODUCTS, INC.            Topic: A11052

    Heavy add-on-armor installed on the Bradley Fighting Vehicle has degraded the vehicle"s mobility performance. Vehicle acceleration has declined to 80% of its original capability. To cost effectively modernize the mobility system, the final drive torque capacity must be significantly increased to maintain the current package space. Loc Performance Products, Inc., the Army"s provider of robust, ...

    SBIR Phase I 2011 Department of DefenseArmy
  5. Fabric with Variable Air Permeability for Use in Parachutes

    SBC: Wizbe Industries, Inc.            Topic: A10163

    Identification and Significance of the Problem or Opportunity. Current Military parachute canopies are constructed from cloth that has a fixed air permeability. The level of air permeability in a fabric significantly affects the opening speed of the parachute, filling time, opening shock and rate of descent. The air permeability of the fabric remains cannot be altered once the canopy is construc ...

    SBIR Phase I 2011 Department of DefenseArmy
  6. LSPR Nanostructures for SERS

    SBC: REAL-TIME ANALYZERS INC            Topic: A11019

    The overall goal of this proposed program (through Phase III) is to develop a chemical warfare agent analyzer capable of detecting vapor phase agents at 10-7g/m3 in less than 1 minute. This will be accomplished by developing a method to produce novel localized surface plasmon resonance (LSPR) nanostructures, supported by theory, that produce a minimum surface-enhanced Raman scattering (SERS) enha ...

    SBIR Phase I 2011 Department of DefenseArmy
  7. Weapon Orientation Sensor for Simulated Tactical Engagement Training

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: A11055

    Weapon orientation systems work in a Line-of-Site (LOS) manner using a Multiple Integrated Laser Engagement System (MILES). The Army is seeking a non-LOS solution for long range weapon orientation. High end Inertial Measurement Units (IMUs) provide the required accuracy for this functionality but, are unsuitable because of their size, power draw, and cost. The Army is requesting a low cost IM ...

    SBIR Phase I 2011 Department of DefenseArmy
  8. Phased array three-dimensional beam steering system for millimeter wave sources emitting in the 100-300 GHz region

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: A11006

    Herein, we propose a novel approach to achieving a broadband, phased-array transmitter operating at frequencies from 100-300 GHz. Our approach is based on the concept of optically distributing a pair of locked optical tones to an array of antenna coupled photomixers. Lightweight optical fibers enable the distribution of these optical tones to any arbitrary antenna array geometry with antenna pla ...

    SBIR Phase I 2011 Department of DefenseArmy
  9. High-Strength, Lightweight Metal Matrix Composites (MMC) Material for Bridge Applications

    SBC: M CUBED TECHNOLOGIES, INC.            Topic: A11063

    The Army is in need of an improved material for use in bridge structures. Key requirements are reduced weight relative to current metallic structures (steel and aluminum), high strength, resistance to catastrophic failure, attractive cost, and resistance to environmental factors (weather, corrosion, erosion, extreme temperatures, UV, etc.). To meet this need, the use of macro-composite structure ...

    SBIR Phase I 2011 Department of DefenseArmy
  10. Safe High Rate and Ultra High Capacity with Minimum 4.0 Amp. hour 18650 lithium ion rechargeable cell

    SBC: Yardney Technical Products, Inc.            Topic: A11024

    This proposal addresses the Army"s need for rechargeable 18650-type lithium-ion cells with specific energy greater than 300 Wh/kg for Land Warrior applications. The proposed cells will allow a Soldier to drastically extend the mission run time and reduce the frequency of changing the batteries. The improvements in specific energy will be achieved by radical enhancements of the cell"s chemistry and ...

    SBIR Phase I 2011 Department of DefenseArmy
US Flag An Official Website of the United States Government