You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Radiation Hardened Electronics and Techniques

    SBC: INNOSYS, INC.            Topic: MDA18007

    The MDA has needs for radiation-hardened electrical components and circuits. Thermionic-based vacuum devices have demonstrated their ruggedness and insensitivity to radiation, making them the top choice for space based operation.However, manual and cumbersome fabrication does not render it to circuit integration in an integrated circuit (IC) format to ensure best reliability and performance possib ...

    SBIR Phase I 2018 Department of DefenseMissile Defense Agency
  2. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: FLIGHTWARE INC            Topic: DLA181002

    The In Process Control for L-PBF (IPCL) program leverages and in process inspection method recently developed and successfully demonstrated for NASA. This Layer Topographic Map or LTM method measures the surface if every melt layer using a commercial laser profilometer. LTM software detects, locates and identifies flawed regions within a layer for every layer in the part. It does so for several co ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Development of “Permit Wizard” Software for AssistedPermit Application Completion

    SBC: TOTAL QUALITY SYSTEMS, INC.            Topic: 833

    TECHNICAL ABSTRACT: The objective of this project is to research the technical feasibility of designing a software tool “Permit Wizard” that will automate the process for aquamarine permit application submittal, review, approval/disapproval and issue (including collection of fees). Aquaculture producers are currently faced with slow, complex, and often confusing permitting processes that must ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Novel nanostructure anode and cathode for new class of high energy and power thermal batteries

    SBC: BINERGY SCIENTIFIC, INC.            Topic: MDA15021

    Thermal batteries are single discharge reserve batteries that provide very long shelf life, minimal self-discharge, wide storage temperature range, fast activation under sudden power demand, and also wide range of temperature operating conditions. Such unique properties among electrochemical power systems are provided with application of molten salt electrolyte, which is in solid form under normal ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  5. Rugged MEMS IMU for Missile Applications

    SBC: EVIGIA SYSTEMS LLC            Topic: MDA15026

    This proposed SBIR Phase I effort initiates the development of rugged MEMS inertial measurement units (IMUs) for operation in high shock and vibration operation environment of missiles, and other military and commercial platforms with harsh environment characteristics. The primary outcome of the proposed effort is a 6-axis highly-reliable and durable tactical-grade MEMS IMU with inclusion of vibra ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government