You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of “Permit Wizard” Software for AssistedPermit Application Completion

    SBC: TOTAL QUALITY SYSTEMS, INC.            Topic: 833

    TECHNICAL ABSTRACT: The objective of this project is to research the technical feasibility of designing a software tool “Permit Wizard” that will automate the process for aquamarine permit application submittal, review, approval/disapproval and issue (including collection of fees). Aquaculture producers are currently faced with slow, complex, and often confusing permitting processes that must ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  2. A Location-based Weather Threat Tracking and Notification System

    SBC: CFD RESEARCH CORPORATION            Topic: 834

    TECHNICAL ABSTRACT: CFDRC proposes the creation of an innovative location-based threat tracking and notification system to allow users to receive hazardous weather messages from the NWS with their call to action, allow users to receive custom-tailored messages about threats, and visualize relevant weather information within their area. The focus is on a tool that allows this information to be comm ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Development of a Rapid Monitoring System for Detection of Pathogens in Marine Aquaculture Operations

    SBC: INNOVAPREP LLC            Topic: 836

    TECHNICAL ABSTRACT: InnovaPrep proposes to develop a rapid sample-to-answer monitoring system for detecting pathogens in marine aquaculture waters. An assessment of industry needs will include a kickoff meeting with NOAA and a visit to Toby Island Bay Oyster Farm. Following the assessment and report, a TRL-4 breadboard prototype system will be developed that will include the combination of sample ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Deep Sea Vision AI: Deep Learning-Based Real-Time Marine Animal Detection for Entanglement Mitigation

    SBC: SYNTHETIK APPLIED TECHNOLOGIES LLC            Topic: 832

    TECHNICAL ABSTRACT: The objective of this project is to develop and implement a real-time detection and warning system to mitigate marine entanglement events in offshore aquaculture operations. In order to achieve this, we leverage the latest advances in computer vision, deep learning, and real-time object detection to develop a real-time marine life detection, classification and tracking pipeline ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Enhanced Canine Performance, Protection and Survivability

    SBC: Metro International Biotech, LLC            Topic: SOCOM172002

    Given the benefits of exercise on general health, orally active compounds that can mimic or potentiate the effects of exercise have been of keen interest as therapeutic and dietary ingredients. Our proposed approach for enhancement of USSOCOM Multi-Purpose Canine (MPC) endurance and sensory performance using an exercise mimetic is based on the observation that age-related decline of nicotinamide ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  6. Group 2 (<55lbs) Unmanned Aerial System for Special Operations Forces Tactical-Level Intelligence, Surveillance, and Reconnaissance Operations

    SBC: Knight Technical Solutions, LLC            Topic: SOCOM172005

    The proposed Group 2 UAS is a long endurance fixed wing aircraft, a secure communications system and a portable ground station. The light weight aircraft features a high aspect ratio wing and is powered by an electric ducted fan for maximum efficiency. The modular aircraft system is one man portable and designed to be packed out on a molle backpack configuration. The conceptual airframe design ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  7. Group 2 (<55lbs) Unmanned Aerial System for Special Operations Forces Tactical-Level Intelligence, Surveillance, and Reconnaissance Operations

    SBC: SEALANDAIRE TECHNOLOGIES, INC.            Topic: SOCOM172005

    SeaLandAire Technologies, Inc. (SLA) proposes to meet this Group 2 need with an electric drive concept that will be capable of a 20-30 lbs. modular payload, with comparable range and endurance to current grp 2 ISR UAS, while still maintaining sufficient ISR capabilities. This UAS concept is able to covertly and safely deliver payload to within 1 meter accuracy, then extract a different payload an ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  8. High Performance Marine Diesel Closed Coolant System for High Speed Combatant Craft

    SBC: GS ENGINEERING INC            Topic: SOCOM14005

    USSOCOM has expressed a desire to prevent the clogging of the seawater intakes aboard the SOC-R craft by exploring a closed-loop cooling system that does not require the use of off-board raw water. The desired solution will not degrade the current SOC-R craft capabilities by creating drag or causing cavitation that would affect the performance of the Hamilton jets, thereby reducing speed, would no ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  9. Low Cost Opaque Armor Material and Manufacturing for Non Standard Commercial Vehicles

    SBC: CFD RESEARCH CORPORATION            Topic: SOCOM14003

    A novel composite structure based low cost opaque armor material and associated manufacturing/installation method are proposed. This process offers immediate field upgrade potential to Non Standard Commercial Vehicles (NSCV) capable of advancing into denied areas while operating indistinguishably from indigenous platforms. Our innovative armor installation procedure has already been shown to incr ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  10. Development of Sustainable, Multi-Seasonal, Multi-Species, Marine Algal Aquaculture in Coastal Maine

    SBC: Maine Fresh Sea Farms, LLC            Topic: 81

    This Phase I proposal determines the feasibility of growing multiple species of macroalgae in commercial marine aquafarm environments. Marine aquaculture is a logical outgrowth of successful wild harvest seaweed businesses over the last several years. Developing a marine aquaculture prototype will foster the science of sea farming. Extending growing seasons for multi-species would provide year ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government