You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Algorithms for Look-down Infrared Target Exploitation

    SBC: SIGNATURE RESEARCH, INC.            Topic: 1

    Signature Research, Inc. (SGR) and Michigan Technological University (MTU) propose a Phase I STTR effort to develop a learning algorithm which exploits the spatio-spectral characteristics inherent within IR imagery and motion imagery.Our archive of modelled and labeled data sets will allow our team to thoroughly capture the variable elements that will drive machine learning performance.The overall ...

    STTR Phase I 2018 Department of DefenseNational Geospatial-Intelligence Agency
  2. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: FLIGHTWARE INC            Topic: DLA181002

    The In Process Control for L-PBF (IPCL) program leverages and in process inspection method recently developed and successfully demonstrated for NASA. This Layer Topographic Map or LTM method measures the surface if every melt layer using a commercial laser profilometer. LTM software detects, locates and identifies flawed regions within a layer for every layer in the part. It does so for several co ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Development of “Permit Wizard” Software for AssistedPermit Application Completion

    SBC: TOTAL QUALITY SYSTEMS, INC.            Topic: 833

    TECHNICAL ABSTRACT: The objective of this project is to research the technical feasibility of designing a software tool “Permit Wizard” that will automate the process for aquamarine permit application submittal, review, approval/disapproval and issue (including collection of fees). Aquaculture producers are currently faced with slow, complex, and often confusing permitting processes that must ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. DLA 171-001: SAR for NIIN: 01-411-4863

    SBC: Rose-A-Lee Technologies            Topic: DLA171001

    Team Rose-A-Lee has extensive experience with the RE process, development of TDPs, fabrication, and manufacturing to enable the proposed solution. The overall goal of the Phase I effort is to demonstrate (to DLA Value Engineering (VE) and Engineering Support Activity (ESA)) through Rose-A-Lees proven process that the proposed SAR package is ready for Phase II development. Phase I will deliver a pr ...

    SBIR Phase I 2017 Department of DefenseDefense Logistics Agency
  5. ULTRA HIGH SPEED AND PRECISION HYDROSTATIC GRINDING SPINDLE WITH AXIAL OSCILLATION OF THE ROTATING SHAFT

    SBC: ELKA PRECISION, LLC            Topic: DLA07001

    We propose to develop an ultra-high speed hydrostatic spindle with maximum speed of 120,000rpm and combine it with high frequency axial oscillations of about few kilohertz. Ultra-high speed hydrostatic spindle for internal grinding with axial oscillations of rotating shaft effectively combines advantages of hydrostatic spindles with the unique technological potential of high frequency axial oscil ...

    SBIR Phase I 2007 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government