You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Proposed Project Title Atlantis AI Based Long Range Space Weather Prediction System
SBC: Atlantis Industries, Inc. Topic: 95To date, no realizable method of predicting the occurrence or magnitude of a Solar Energetic Particle (SEP) event has been developed. There are multiple models currently available in the Community Coordinated Modeling Center (CCMC) through Goddard Space Flight Center that attempt to provide timely and accurate event propagation (e.g.MAG4, Enlil, and SEPMOD). None of these have yet achieved the goa ...
SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Advanced Wearable/Smart Contact Lens for Cognitive State Assessment
SBC: TIETRONIX SOFTWARE INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Wearable Technologies for Physiological Monitoring VitalScopeTM- Ingestible Capsule for Vital Signs Monitoring
SBC: NANOHMICS INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
A234-005- Holistic Health and Fitness Readiness Kit ABS Proposal
SBC: ASSISTED BUILDING SOLUTIONS LLC Topic: A234005ABS, partnered with SMM is pleased to present design solutions for the Army's Holistic Health and Fitness Readiness Kit requirement. The objective of our solutions is to ensure critical innovative technique, cost and time efficiency, mobility, provide a 25–50-year life cycle, and encompass the NFAP 285, and the New ASCE 7-22 codes design standards. Our building solutions meet the energy, heigh ...
SBIR Phase I 2023 Department of DefenseArmy -
SIFTER: Signals Intelligence Field Tool for Enhanced Recognition
SBC: LYNNTECH INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Synthetic EO/IR Image Generation for Computer Vision/ATR
SBC: THERMOANALYTICS INC Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Strengthening Supply Chain Resilience Through Automated Data Labeling and Predictive Analytics
SBC: R4 TECHNOLOGIES, INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
r4 Dynamic Tours: Predictive Perimeter Defense to Enhance Threat Detection and Prevention
SBC: R4 TECHNOLOGIES, INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Structurally Jointed Domestic Hardwood Lumber with Enhanced Durability for Trailer Decking
SBC: SUPERIOR SUSTAINABLE SOLUTIONS LLC Topic: A224014Redacted
SBIR Phase I 2023 Department of DefenseArmy