You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains
SBC: Beacon Industries, Inc. Topic: DLA231001The Oshkosh M1070 is a US Army tank transporter tractor unit that is also used in the military for various operations and military drills. It is a powerful tractor truck with an 8x8 drive configuration and advanced features such as an electronic engine control system to ensure maximum efficiency at all times and an 'air ride' rear suspension to ensure all axles remain in contact with the ground ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains (DLA232-001)
SBC: Beacon Industries, Inc. Topic: DLA232001Coupling, Shaft is a mechanical component used to connect two rotating shafts together, allowing the transmission of power and torque. It helps to minimize the effects of misalignment, vibration, and shock and reduces the stress and wear on the connected shafts and their bearings. The Coupling, Shaft (NSN 3010-01-679-7883) listed in Small Business Innovation Program website is an aviation critical ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Azimuth Telescope Reverse Engineering and Manufacturing Design
SBC: NIELSON SCIENTIFIC LLC Topic: DLA232001This project will result in a new supplier for a specific azimuth telescope that is a critical component in existing Department of Defense systems. Currently, there is no existing supplier for the azimuth telescope and there is no technical or engineering information available for the azimuth telescope that could be used by a new supplier to begin manufacturing the azimuth telescope. To address th ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
97ND7-SP4701-22-P-0061-Phase II Report-Innovative Approaches to the Headlamp Redesigns
SBC: MAGWERKS VISION INC. Topic: DLA222002GVSC Sustainment Engineering has requested information for a project to replace Lamp, Halogen 12360840-1 due to stock issues. MWV has met with the team and understand the request. Based upon initial concept discussions, MWV has the ability to design and supply a replacement solution. This will include removing existing Lens, Lamp, Reflector and all hardware needed for these items. MWV will then re ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Rapid densification for solid-state electrolyte production
SBC: ZAKURO INC Topic: DLA203004Solid-state batteries promise energy densities well beyond that of current Li-ion batteries while providing additional safety through the elimination of the flammable liquid electrolyte. Of the solid-electrolytes currently under development, Li7La3Zr2O12 (LLZO) is attractive due to its inherent stability versus Li metal. One drawback for LLZO and any oxide electrolyte is the high temperatures requ ...
SBIR Phase II 2022 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA's Critical Supply Chains
SBC: Beacon Industries, Inc. Topic: DLA221001Beacon Industries Inc., a woman owned small business continuously operating since 1948, proposes to improve both product availability and increased competition through the development of a complete Technical Data Package (TDP) for NSN 2840-01-675-7360 ( Compressor Rotor ) with the utilisation of government-provided technical data or through reverse inspection & engineering techniques. ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
Engaging the Small Business manufacturing Defense Industrial Base
SBC: ADAPTIVE MANUFACTURING SOLUTIONS LLC Topic: DLA221001DLA has a desire to expand and increase the number of small manufacturers to address DOD demands and grow the Defense Industrial Base (DIB). More qualified sources of supply are needed to improve DLA product availability, provide competition to reduce cost and lead time, address lifecycle performance issues, and potentially improve upon the current part design. Working collaboratively, AMS a W ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains
SBC: Beacon Industries, Inc. Topic: DLA222001Beacon Industries Inc., an ITAR Compliant woman owned small business continuously operating since 1948, proposes to improve both product availability and increased competition through the development of a complete Technical Data Package (TDP) for NSN 3020-01-294-7175 ( Spur Gear ) with the utilization of government-provided technical data or through reverse inspection & engineering tec ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
MagWerks Lamps for Drop-in Energy Efficient Vehicular Lighting
SBC: MAGWERKS VISION INC. Topic: DLA222002MagWerks Vision Inc. will perform a feasibility study for their vehicular lighting system as it applies to the B-52H bomber aircraft. Through this phase I effort, MWV aims help the Air Force achieve its goal of “resiliency and redundancy” by designing, testing, and validating its lighting solution for application to Air Force aircrafts, specifically the B-52H (af.mil). The expectation is th ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
Manufacturing Technology Development for Production of Nitrate Salts
SBC: NALAS ENGINEERING SERVICES INC Topic: DLA222005The DoD has identified a deficiency in the Industrial Base for the supply of various nitrate salts, specifically potassium, barium, strontium and lead nitrate. There appears to be insufficient domestic manufacturing capacity to meet the DoD’s needs for these salts. Without a trusted and reliable domestic industrial base supplier of these materials, there is a serious threat to warfighter prepa ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency