You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Laser/Microwave Energy Deposition to Improve Control/Performance of High Speed Vehicles

    SBC: PHYSICS, MATERIALS, AND APPLIED MATHEMATICS RESEARCH L.L.C.            Topic: AF103009

    ABSTRACT:In this effort, we will couple the energy of focused microwave bursts into the air and onto surfaces by first forming a laser plasma. The presence of the laser plasma allows much lower microwave intensities to couple their energy to the laser-pre-ionized surface or air- volume, allowing more efficient energy-transfer and the use of lower-power microwave systems to achieve the desired effe ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Wireless Power for Battlefield Airmen Operation

    SBC: Armorworks Enterprises, Inc.            Topic: AF121192

    ABSTRACT: A phase II program is proposed leading to integrate wireless inductive power transfer technology on two prototype tactical vests. The focus of the phase II program would be the development and evaluation of a full-scale inductive power transfer system on a PRC-152 radio by both modifying and interfacing its battery. Because a mating vest/pouch that contains inductive charging circuits so ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. Holographic Video Display Using Novel Guided-wave Scanning System

    SBC: TIPD LLC            Topic: AF131023

    ABSTRACT:Todays analysts need improved 3D visualization tools to assist in critical situations such as deconfliction, line-of-sight analysis, air space and satellite control.Currently available 3D displays cannot provide the level of detail and comfort needed because the displays contain unacceptable visual artifacts, do not provide full parallax, require special headgear, and induce nausea in man ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. RAMSES

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: AF131204

    ABSTRACT: The floor of an ALC is like a well-orchestrated dance. However, when an unexpected failure occurs, it can introduce significant delays in not only the specific aircraft"s maintenance, but of the entire network of systems. 21st Century Systems, Inc. (21CSi) is in the position to answer this challenge with a concept called Reactive Aircraft Maintenance System via Evolutionary Scheduling ( ...

    SBIR Phase I 2015 Department of DefenseAir Force
  5. Heterojunction GeSn based Photonic Devices

    SBC: Quanttera LLC            Topic: AF141002

    ABSTRACT: Si photonic devices based on GeSn materials will be very important for the MWIR. The Air Force recognizes the need for next-generation high-performance photonic materials in the SWIR to MWIR infrared spectrum, due in part to the atmospheric high transmissive windows in this wavelength ranges. Due to materials limitations, silicon based photonic devices have not been utilized in this wa ...

    SBIR Phase I 2015 Department of DefenseAir Force
  6. Just In Time (JIT) Aircraft Maintenance System

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: AF121225

    ABSTRACT:The High Velocity Maintenance (HVM) initiative strives to reduce aircraft downtime while maintaining the most capable air fleet that achieves Air Force mission requirements.Unscheduled maintenance, due to issues uncovered midway into the maintenance work, introduces the most delays that negatively impact HVM turnaround time.To increase the predictability of the actual maintenance required ...

    SBIR Phase II 2015 Department of DefenseAir Force
  7. Ultra Compact, Lightweight, Fast Response Cetane Sensor for Heavy Fuels

    SBC: PRECISION COMBUSTION, INC.            Topic: AF131158

    ABSTRACT: U.S military logistics fuels such as JP-8 and JP-5 are used across the full range of its IC engines, from those adapted from Avgas to Remove Piloted Aircraft (RPA) applications to heavy duty compression ignition engines. Yet unlike commercial diesel fuels, these distillate fuels have no cetane specification, and so vary widely in this key measure of ignition delay. The result can be s ...

    SBIR Phase II 2015 Department of DefenseAir Force
  8. Optical System for Precision Atomic Clocks and Stable Oscillators

    SBC: N.P. PHOTONICS, INC.            Topic: AF141126

    ABSTRACT:Ultra-stable and accurate frequency and timing devices such as atomic clocks are essential for modern communication, navigation, surveillance, and missile guidance systems. There are many atomic oscillators such as neutral calcium and neutral ytterbium that produce clock signal in optical domain. However, these optical standards are expensive and not widely available. The phase stabilized ...

    SBIR Phase II 2015 Department of DefenseAir Force
  9. Nonequilibrium Plasma-Assisted Combustion-Efficiency Control in Vitiated Air

    SBC: CU AEROSPACE L.L.C.            Topic: AF13AT04

    ABSTRACT: CU Aerospace (CUA) and team partner the University of Illinois at Urbana-Champaign (UIUC) propose to perform research, development and demonstration of experimental quenching free measurements of heat-release in a realistic highly turbulent plasma-assisted flame. Kinetics models will be correspondingly updated and detailed 3D multiphysics simulations will be validated by the measurements ...

    STTR Phase II 2015 Department of DefenseAir Force
  10. Full-Scale Near-Field Acoustic Holography for Reduction of Annoyance and Disturbance

    SBC: SOUND ANSWERS, INC.            Topic: AF151021

    ABSTRACT:Noise levels of military jet aircraft have significantly increased as the power of the engines has increased creating a community noise issue around military airfields. Current noise monitoring requirements only measure sound pressure levels which do not correlate to human annoyance / disturbance. Sound Answers plans to apply their extensive Sound Quality background to establish new acous ...

    SBIR Phase I 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government