You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  2. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Transportation
  3. PROPOSAL TO DEVELOP A COMPREHENSIVE FREIGHT INFORMATION SYSTEM

    SBC: Colography Group Inc.            Topic: N/A

    THE FOLLOWING PROPOSAL PROVIDES THE RATIONALE AND METHODOLOGICAL APPROACH FOR THE DEVELOPMENT OF A GEOGRAPHICALLY DETAILED VISUAL DATABASE AND RETRIEVAL SYSTEM TO SUPPORT THE INTERMODAL PLANNING REQUIREMENTS OF ISTEA. CURRENTLY, STATES AND METROPOLITAN PLANNING ORGANIZATIONS HAVE ACCESS TO LIMITED AND INCONSISTENT FREIGHT INFORMATION RESOURCES WITH WHICH TO INTEGRATE INTO INTERMODAL PERFORMANCE SY ...

    SBIR Phase II 1995 Department of Transportation
  4. PROPOSAL TO DEVELOP A COMPREHENSIVE FREIGHT INFORMATION SYSTEM

    SBC: Colography Group Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  5. A P-VERSION OF THE FINITE ELEMENT ALTERNATING METHOD

    SBC: Knowledge Systems Inc.            Topic: N/A

    THE PROPOSED RESEARCH WILL DEVELOP A P-VERSION OF THE FINITE ELEMENT ALTERNATING METHOD (FEA). THE P-VERSION OF THE FEAM WILL ALLOW FOR THE ACCURATE CALCULATION OF FRACTURE PARAMETERS WHILE MINIMIZING THE MODELING EFFORT REQUIRED OF THE USER. THESE TWO BENEFITS WILL MAKE THE FRACTURE MECHANICS COMPUTATIONS NECESSARY FOR THE PREDICTION OF THE RESIDUAL LIFE OF AIRCRAFT STRUCTURES MORE COST EFFECTIVE ...

    SBIR Phase I 1993 Department of Transportation
  6. Development of Transit Educational Software Tools for Handheld Computers

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    Success in increasing seat belt and bicycle helmet usage has been accelerated by teaching children the value. This accomplishes two purposes: the children gow up with these as a natural part of their behavior and they insist that family members adopt the practices. Therefore, it is imperative that children learn the importance of transit and understand that it provides a convenient, reliable an ...

    SBIR Phase I 2004 Department of Transportation
  7. DEVELOPMENT OF NOTEBOOK COMPUTER SOFTWARE TO COLLECT TRIP GENERATION DATA AT INTERMODAL PASSENGER AN FREIGHT TERMINALS

    SBC: Transportation Consulting Mda            Topic: N/A

    WITH THE PASSAGE OF THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT, THERE BECAME A HEIGHTENED AWARENESS THAT OUR UNDERSTANDING OF INTERMODAL AND MULTIMODAL FACILITIES WAS LIMITED. PRIVATE ENTERPRISE HAS BEEN WORKING FOR MANY YEARS ON APPLICATIONS WHICH WOULD ALLOW FOR A PACKAGE TO MOVE FROM POINT A TO POINT B BY THE MOST EFFICIENT MODE, WITH THE PURCHASER OF THE SERVICE ONLY BEING AWARE OF A ...

    SBIR Phase II 1995 Department of Transportation
  8. DEVELOPMENT OF NOTEBOOK COMPUTER SOFTWARE TO COLLECT TRIP GENERATION DATA AT INTERMODAL PASSENGER AN FREIGHT TERMINALS

    SBC: Transportation Consulting Mda            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  9. Reducing Impact of Severe Space Weather on Global Positioning System (GPS) Satellite Users

    SBC: PROPAGATION RESEARCH ASSOCIATES, INC            Topic: 844W

    In Phase II, Propagation Research Associates, Inc., (PRA) proposes to complete the development of a real-time nowcast of ionospheric scintillation impacts on GPS users. Continuing its partnership with NASA’s Jet Propulsion Laboratory, PRA will implement real-time production of a map of ionospheric scintillation parameters over the United States using real-time data streamed from the National Geo ...

    SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  10. Long Range ROW Detection and Warning System

    SBC: R-DEX SYSTEMS, INC.            Topic: 151FR7

    R-DEX Systems proposes to develop the TrackMap System, an innovative and groundbreaking long-range detection and warning system (DWS) for the detection of unlawful targets on the railroad right of way (ROW). TrackMap will leverage low-cost radar sensors, proven software, and high-performance embedded processing to enable the Federal Railroad Administration (FRA) and its safety partners to signific ...

    SBIR Phase I 2015 Department of Transportation
US Flag An Official Website of the United States Government