You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Simulation Test and Analysis for IoT (InstaIoT)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF2210016

    Integrated Simulation Test and Analysis for IoT (InstaIoT) offers a cloud-based platform for collaborative IoT modeling and simulation, providing IoT system designers and evaluators a powerful tool to design, test and evaluate the capability and performan

    SBIR Phase II 2023 Department of DefenseAir Force
  2. HIDEHO: HIerarchical DistributEd Heterogenous Optimization

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: AF21BT001

    Large-scale military and civilian planning problems are (1) distributed – decision-making is spread across multiple organizations, including organizations that must employ information that they are unable or unwilling to share; (2) heterogeneous – the domains of optimization and local criteria for optimality differ – and (3) hierarchical – higher levels of authority solve abstract versions ...

    STTR Phase II 2023 Department of DefenseAir Force
  3. Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets

    SBC: 60Hertz Incorporated            Topic: 92

    This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...

    SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Novel Personal Thermal Comfort Models for Weather-Ready Decision-Making

    SBC: WEATHERVANE LABS LLC            Topic: 92

    In this Phase II project, we will demonstrate a prototype in an operationally-relevant environment for Climatize®, a cloud-based software platform with the novel capability to determine and deliver user-specific thermal comfort information for weather-ready decision-making. People and organizations in a Weather-Ready Nation adapt to weather changes and environmental events with resilience. A chal ...

    SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  5. NECTAR: The Negative CO2 Emission Transition Roadmap

    SBC: CARBON SOLUTIONS LLC            Topic: C5322c

    C53-22c-271119Meeting climate-stabilizing energy transition goals requires using hybrid-energy CO2 capture systems like Direct Air Capture (DAC) to remove billions of tonnes of CO2 from the atmosphere. Deploying this capacity will be difficult because it is complex and energy intensive infrastructure, and there must also be buy- in from communities living in locations best suited for it. The chall ...

    SBIR Phase II 2023 Department of Energy
  6. Radiation Mitigated State of the Art Field Programmable Gate Array (FPGA)

    SBC: TRUSTED SEMICONDUCTOR SOLUTIONS INC            Topic: MDA21022

    Trusted Semiconductor Solutions will demonstrate how a COTS FPGA can withstand natural and manmade radiation, and how our radiation circumvention and recovery approach enables high density electronic payloads needed for next generation guided missile and space applications. We will develop a prototype FPGA demonstration vehicle that utilizes an Intel Agilex F-series COTS FPGA and our operate-throu ...

    SBIR Phase II 2023 Department of DefenseMissile Defense Agency
  7. REPAIRing with an OpenMIND

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: SB162005

    Most AI agent systems are extremely brittle: they use hand-crafted or laboriously-learned models that cannot handle situations that deviate widely from their expectations or training set. Real-world applications required more robust and resilient methods. In the original REPAIR Phase I and Phase II projects, we developed general metaheuristics for decentralized multi-agent systems that are capable ...

    SBIR Phase II 2022 Department of DefenseDefense Advanced Research Projects Agency
  8. Document Generation Platform (DGP)

    SBC: Inkit Inc.            Topic: AF20CTCSO1

    Currently, defense-wide USG organizations can take weeks to compile critical reports, assembling information and data using the “cut and paste” method. These critical reports synthesize newly available information to assist in decision-making on both a po

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Metis (Modernization Enhancement Technology Insertion System)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: N211023

    Metis enables collaborative mission planning across locations connected by low-bandwidth, unreliable network links.  It provides a Synchronization Service to ensure planners at different locations have consistent views of plans and planning data.  This service works across network connections and disconnections and can detect conflicts when service state is updated independently at different loc ...

    SBIR Phase II 2023 Department of DefenseNavy
  10. Foreign Object Retrieval System (FORS)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF2310014

    Flightline workers currently perform foreign object debris (FOD) checks prior to every airfield entry, which may be adversely affected by various external factors. Any missed foreign object (FO) presents a significant hazard to aircraft operating on the a

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government