You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A BURIED ELECTRODE MACH ZEHNDER WAVEGUIDE INTENSITY MODULATOR WITH OPERATION SPEEDS IN EXCESS OF 100 GHZ

    SBC: Apa Optics, Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES AN APA OPTICS PROGRAM TO DEVELOP A HIGH SPEED (100GHZ) GAAS WAVEGUIDE BASED MACH ZEHNDER MODULATOR. OUR APPROACH CENTERS ON THE USE OF A BURIED ELECTRODE CONFIGURATION TO ACHIEVE VELOCITY MATCHING OF THE RF AND OPTICAL SIGNALS. THIS WE FEEL WILL RESULT IN A DEVICE WITH A BROADBAND RESPONSE FROM DC TO 100GHZ. WE WILL WORK IN CONJUNCTION WITH THE ULTRFAST SCIENCE LAB AT THE U ...

    SBIR Phase I 1992 Department of DefenseArmy
  2. Accelerated Reconnaissance Window Development

    SBC: Third Wave Systems, Inc.            Topic: AF093129

    Grinding is used to satisfy figure and finish requirements for optics, removing successive layers of material to ensure alleviation of any damage created from the prior operation. Consequently, fabrication times are slow and expensive. The optics manufacturing industry currently lacks physics-based models needed to understand the impact of process and material variables on final part quality and ...

    SBIR Phase I 2010 Department of DefenseAir Force
  3. Acoustically Intelligent Surfaces for C2 Communication Shelters

    SBC: QUALITY RESEARCH, DEVELOPMENT & CONSULTING, INC.            Topic: N/A

    "Noisy enclosures present a problem of great importance to the Army's Command and Control Operations On-the-Move for Future Combat Systems. Examples of these noisy enclosures are Command and Control communications shelters and Vehicles. Fully equippedcommunication shelters are extremely noisy. A unique and effective solution to the noise problem in both fixed and mobile shelters is offered. The ...

    SBIR Phase I 2002 Department of DefenseArmy
  4. Acoustically Intelligent Surfaces for C3 Shelters

    SBC: QUALITY RESEARCH, DEVELOPMENT & CONSULTING, INC.            Topic: N/A

    Noisy enclosures present a problem of great importance to the Army's Command and Control Operations On-the-Move for Future Combat Systems. Examples of these noisy enclosures are Command and Control communications shelters and vehicles. Fully equippedcommunication shelters are extremely noisy. A unique and effective solution to the noise problem in both fixed and mobile shelters is offered. The ...

    SBIR Phase II 2003 Department of DefenseArmy
  5. Active Balancing for Lift Fan Drive Shaft

    SBC: IMLACH CONSULTING ENGINEERING            Topic: N/A

    This Phase I SBIR Project will develop an Advanced Unbalance Control (AUC) system based on active magnetic bearing (AMB) technology and advanced feedforward control algorithms. The AUC system will offer at least an order of magnitude increase in bothresponse speed and unbalance response reduction as compared to the best available mechanical unbalance cancellation methods. This will be accomplish ...

    SBIR Phase I 2003 Department of DefenseNavy
  6. ACUMEN: Analyzing Cultural Motif Effects in Networks

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: OSD12LD8

    A motif is a non-commonplace, specific narrative element (such as a striking event, character, or object) that is repeated across stories found within the same cultural group, and concisely expresses complex cultural and political ideas through the inferences it evokes about a particular situation. If we can track motifs in communications, we will have a significant advantage in modeling informati ...

    SBIR Phase II 2019 Department of DefenseDefense Advanced Research Projects Agency
  7. Adapting IP QoS Provisioning Techniques to Wireless Networks

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: N/A

    Over the past decade there has been a rapid growth of wireless communication technology. As a result, portable computing devices such as notebook computers and personal digital assistants have begun to take advantage of wireless technology, thus providingincreasing access to wireline multimedia applications for mobile users. For multimedia applications to be supported successfully in wireless netw ...

    SBIR Phase I 2001 Department of DefenseArmy
  8. Adaptive and Integrated Multicast for the Airborne Networks (AIM-AN)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF112035

    ABSTRACT: Secure and efficient IP multicast improves efficiency of bandwidth utilization in tactical networks such as the Airborne Networks and facilitates effective and timely dissemination of mission critical information among tactical edge users. In this SBIR effort, Architecture Technology Corporation (ATC) proposes an innovative Adaptive and Integrated Multicast for the Airborne Networks (AI ...

    SBIR Phase I 2012 Department of DefenseAir Force
  9. Adaptive and Integrated Multicast for the Airborne Networks (AIM-AN)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF112035

    ABSTRACT: The Air Force has identified the need for a technological capability to provide secure, dynamic and efficient multicast services over crypto-partitioned heterogeneous tactical networks, to ensure efficient use of bandwidth-constrained airborne networks. During Phase I of this SBIR, Architecture Technology Corporation (ATC) defined an innovative technology called Adaptive and Integrated ...

    SBIR Phase II 2013 Department of DefenseAir Force
  10. Adaptive Management of Multimedia Networks

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: N/A

    The Navy's C4I systems of tomorrow will contain networked multimedia applications to support functions used by decision makers and war fighters. A number of challenging problems must be addressed before such networked multimedia applications can be implemented in a cost-effective fashion. One of these challenges is the delivery of audio and full-motion video over a heterogeneous, enterprise- ...

    SBIR Phase I 1997 Department of DefenseNavy
US Flag An Official Website of the United States Government