You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Integrated Simulation Test and Analysis for IoT (InstaIoT)
SBC: ARCHITECTURE TECHNOLOGY INC Topic: AF2210016Integrated Simulation Test and Analysis for IoT (InstaIoT) offers a cloud-based platform for collaborative IoT modeling and simulation, providing IoT system designers and evaluators a powerful tool to design, test and evaluate the capability and performan
SBIR Phase II 2023 Department of DefenseAir Force -
Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets
SBC: 60Hertz Incorporated Topic: 92This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...
SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Novel Personal Thermal Comfort Models for Weather-Ready Decision-Making
SBC: WEATHERVANE LABS LLC Topic: 92In this Phase II project, we will demonstrate a prototype in an operationally-relevant environment for Climatize®, a cloud-based software platform with the novel capability to determine and deliver user-specific thermal comfort information for weather-ready decision-making. People and organizations in a Weather-Ready Nation adapt to weather changes and environmental events with resilience. A chal ...
SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
NECTAR: The Negative CO2 Emission Transition Roadmap
SBC: CARBON SOLUTIONS LLC Topic: C5322cC53-22c-271119Meeting climate-stabilizing energy transition goals requires using hybrid-energy CO2 capture systems like Direct Air Capture (DAC) to remove billions of tonnes of CO2 from the atmosphere. Deploying this capacity will be difficult because it is complex and energy intensive infrastructure, and there must also be buy- in from communities living in locations best suited for it. The chall ...
SBIR Phase II 2023 Department of Energy -
Radiation Mitigated State of the Art Field Programmable Gate Array (FPGA)
SBC: TRUSTED SEMICONDUCTOR SOLUTIONS INC Topic: MDA21022Trusted Semiconductor Solutions will demonstrate how a COTS FPGA can withstand natural and manmade radiation, and how our radiation circumvention and recovery approach enables high density electronic payloads needed for next generation guided missile and space applications. We will develop a prototype FPGA demonstration vehicle that utilizes an Intel Agilex F-series COTS FPGA and our operate-throu ...
SBIR Phase II 2023 Department of DefenseMissile Defense Agency -
REPAIRing with an OpenMIND
SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC Topic: SB162005Most AI agent systems are extremely brittle: they use hand-crafted or laboriously-learned models that cannot handle situations that deviate widely from their expectations or training set. Real-world applications required more robust and resilient methods. In the original REPAIR Phase I and Phase II projects, we developed general metaheuristics for decentralized multi-agent systems that are capable ...
SBIR Phase II 2022 Department of DefenseDefense Advanced Research Projects Agency -
Document Generation Platform (DGP)
SBC: Inkit Inc. Topic: AF20CTCSO1Currently, defense-wide USG organizations can take weeks to compile critical reports, assembling information and data using the “cut and paste” method. These critical reports synthesize newly available information to assist in decision-making on both a po
SBIR Phase II 2023 Department of DefenseAir Force -
Metis (Modernization Enhancement Technology Insertion System)
SBC: ARCHITECTURE TECHNOLOGY INC Topic: N211023Metis enables collaborative mission planning across locations connected by low-bandwidth, unreliable network links. It provides a Synchronization Service to ensure planners at different locations have consistent views of plans and planning data. This service works across network connections and disconnections and can detect conflicts when service state is updated independently at different loc ...
SBIR Phase II 2023 Department of DefenseNavy -
Foreign Object Retrieval System (FORS)
SBC: ARCHITECTURE TECHNOLOGY INC Topic: AF2310014Flightline workers currently perform foreign object debris (FOD) checks prior to every airfield entry, which may be adversely affected by various external factors. Any missed foreign object (FO) presents a significant hazard to aircraft operating on the a
SBIR Phase I 2023 Department of DefenseAir Force -
VOLTA Maturation for AF/DoD Embedded Systems Analysis (V-MESA)
SBC: ADVENTIUM ENTERPRISES, LLC Topic: AF221DCSO1Modern, networked, cyber-physical systems pose a special challenge for Cyber Vulnerability Assessment. Communication protocols may be inherently vulnerable, may be implemented in an unsafe manner, or may be vulnerable to timing attacks, in which carefully-timed inputs can be used to disrupt system operations. Developed under AFRL's NOVA program, Adventium Labs’ VOLTA software automates the p ...
SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency