You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3352 results
  1. LOCAETA: Local Climate Air Emissions Tracking Atlas

    SBC: CARBON SOLUTIONS LLC            Topic: C5516c

    Air quality data from top-of-the-line platforms, such as satellites, are difficult to obtain without a high- level of technical knowledge. For this reason, local air quality patterns and trends are often inaccessible to disadvantaged communities (DACs). Many technologies that will be used for deep decarbonization of industrial and power facilities have the added co-benefit of reducing non-CO2 poll ...

    SBIR Phase I 2023 Department of Energy
  2. NECTAR: The Negative CO2 Emission Transition Roadmap

    SBC: CARBON SOLUTIONS LLC            Topic: C5322c

    C53-22c-271119Meeting climate-stabilizing energy transition goals requires using hybrid-energy CO2 capture systems like Direct Air Capture (DAC) to remove billions of tonnes of CO2 from the atmosphere. Deploying this capacity will be difficult because it is complex and energy intensive infrastructure, and there must also be buy- in from communities living in locations best suited for it. The chall ...

    SBIR Phase II 2023 Department of Energy
  3. Improved Reactor and Catalyst for Light Alkanes to Olefins and Liquid Fuels

    SBC: PRECISION COMBUSTION, INC.            Topic: C4722a

    C47-22a-271388Current manufacturing of ethylene via ethane steam reforming comes with significant energy and carbon emissions costs. A route to low carbon ethylene will have a meaningful impact as ethylene production is the largest world-wide and US chemical process in terms of production volumes, energy consumed, and carbon emitted. This project fits well within an overall strategy for decarboniz ...

    SBIR Phase II 2023 Department of Energy
  4. Biodegradable PFAS-Free Paper and Molded Fiber Tableware for Food Packaging

    SBC: Creekside Environmental Products LLC            Topic: C5619a

    PFAS coatings have been widely used for producing consumable food-related packaging paper and tableware because of their good water and oil resistance. However, the potential risks associated with PFAS leaking during packaging usage and recycling threaten food safety and human health. The Creekside Environmental Products-Mississippi State University (MSU) Team proposes the development of PFAS-free ...

    STTR Phase I 2023 Department of Energy
  5. Biodegradable PFAS-Free Paper and Molded Fiber Tableware for Food Packaging

    SBC: Creekside Environmental Products LLC            Topic: C5619a

    PFAS coatings have been widely used for producing consumable food-related packaging paper and tableware because of their good water and oil resistance. However, the potential risks associated with PFAS leaking during packaging usage and recycling threaten food safety and human health. The Creekside Environmental Products-Mississippi State University (MSU) Team proposes the development of PFAS-free ...

    SBIR Phase I 2023 Department of Energy
  6. Shared Mobility Optimizer

    SBC: TERRACITY LLC            Topic: C5610c

    In the United States, transportation is the leading source of emissions among major industries. This puts pressure on cities to optimize transportation infrastructures to meet decarbonization goals. City planners are required to ingest data from a variety of sources and balance a wide array of priorities ranging from mobility and equality to safety and sustainability. Making decisions for optimal ...

    SBIR Phase I 2023 Department of Energy
  7. Secondary Emission Detector Modules for High Energy Physics Experiments

    SBC: NVIZIX LLC            Topic: C5637a

    We propose simulating and constructing a prototype and demonstration brassboard of a Secondary Emission Sensor Module (SESM) for ionizing radiation, as a proof of principle and guide to Phase II and beyond. The simulation and design studies will guide module construction and point to future uses. The module is anticipated to have ~30 stages of sheet dynode with an areal size ~15x15 cm. It will be ...

    SBIR Phase I 2023 Department of Energy
  8. Multifunctional Ceramic Antifouling, Erosion- and Corrosion-resistant Coating for Hydropower Applications

    SBC: NANOIONIX, LLC            Topic: C5614b

    Hydroelectric power is the world’s largest source of renewable energy. These massive systems are designed for a 50+ year service life, but this can be shortened substantially by poor water quality and the presence of flowing debris, sediment, minerals, and micro- and macro-organisms. Biofouling (especially from invasive species), corrosion, and erosion (wear) of critical components can limit per ...

    SBIR Phase I 2023 Department of Energy
  9. X-RAY SOURCE FOR DETECTOR CALIBRATION

    SBC: omega-p r&d, Inc.            Topic: C5602a

    The US Defense Nuclear Nonproliferation Research and Development agency has an objective to reduce reliance on high-activity commercial and industrial radioactive sources used in calibration systems. One approach to achieve this goal is by use of novel electron accelerators to produce x-rays that can reach the needed gamma-ray dose rate, repeatability, and stability for calibration, while reducing ...

    SBIR Phase I 2023 Department of Energy
  10. Internal Surface Finishing of Additively Manufactured RF Components for Fusion Reactor Applications

    SBC: REM CHEMICALS INC            Topic: C5629a

    Statement of the Problem: In a reactor environment, plasma material interaction (PMI) issues associated with radio frequency (RF) coupling structures are similar to those for the first wall and have been identified as a potential problem. A primary challenge is to obtain high power, breakdown resistant density couplers with low loss compatible with fusion plasmas. Advanced manufacturing techniques ...

    SBIR Phase I 2023 Department of Energy
US Flag An Official Website of the United States Government