You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOCAETA: Local Climate Air Emissions Tracking Atlas

    SBC: CARBON SOLUTIONS LLC            Topic: C5516c

    Air quality data from top-of-the-line platforms, such as satellites, are difficult to obtain without a high- level of technical knowledge. For this reason, local air quality patterns and trends are often inaccessible to disadvantaged communities (DACs). Many technologies that will be used for deep decarbonization of industrial and power facilities have the added co-benefit of reducing non-CO2 poll ...

    SBIR Phase I 2023 Department of Energy
  2. NECTAR: The Negative CO2 Emission Transition Roadmap

    SBC: CARBON SOLUTIONS LLC            Topic: C5322c

    C53-22c-271119Meeting climate-stabilizing energy transition goals requires using hybrid-energy CO2 capture systems like Direct Air Capture (DAC) to remove billions of tonnes of CO2 from the atmosphere. Deploying this capacity will be difficult because it is complex and energy intensive infrastructure, and there must also be buy- in from communities living in locations best suited for it. The chall ...

    SBIR Phase II 2023 Department of Energy
  3. E4S: Extreme-Scale Scientific Software Stack for Commercial Clouds

    SBC: PARATOOLS, INC            Topic: C5302b

    C53-02b-271168The software used in High Performance Computing (HPC) and ArtificialIntelligence/MachineLearning (AI/ML) workloads is increasingly complex to maintain, install, and optimize. More problematic is the poor performance portability of applications between platforms, forcing site-specific re-engineering of codes. Existing solutions to deployment of AI/ML work?ows on commercial cloud envir ...

    SBIR Phase II 2023 Department of Energy
  4. Engineered Enzymes for Polyurethane Recycling

    SBC: Birch Biosciences, LLC            Topic: C5331a

    C53-31a-271169Significant technical innovations are needed to improve the economics of plastic recycling. Plastic recycling rates in the United States have been stagnant for more than a decade: less than 10% of plastics are currently recycled, and only 5.5% of polyurethane plastics are recycled. Plastics have become a major contributor to global warming, as emissions from global plastics productio ...

    SBIR Phase II 2023 Department of Energy
  5. Biodegradable PFAS-Free Paper and Molded Fiber Tableware for Food Packaging

    SBC: Creekside Environmental Products LLC            Topic: C5619a

    PFAS coatings have been widely used for producing consumable food-related packaging paper and tableware because of their good water and oil resistance. However, the potential risks associated with PFAS leaking during packaging usage and recycling threaten food safety and human health. The Creekside Environmental Products-Mississippi State University (MSU) Team proposes the development of PFAS-free ...

    STTR Phase I 2023 Department of Energy
  6. Biodegradable PFAS-Free Paper and Molded Fiber Tableware for Food Packaging

    SBC: Creekside Environmental Products LLC            Topic: C5619a

    PFAS coatings have been widely used for producing consumable food-related packaging paper and tableware because of their good water and oil resistance. However, the potential risks associated with PFAS leaking during packaging usage and recycling threaten food safety and human health. The Creekside Environmental Products-Mississippi State University (MSU) Team proposes the development of PFAS-free ...

    SBIR Phase I 2023 Department of Energy
  7. Off-Grid Micro Hydropower Units for Agricultural Decarbonization

    SBC: CONTINUOUS SOLUTIONS LLC            Topic: C5610a

    The agricultural sector must adopt available technological advances to decrease its significant contributions to greenhouse gas emissions and climate change. Its high levels of energy and water consumption are two of the main sources of inefficiencies. At the same time, many rural communities lack access to reliable electricity, specifically under-utilizing clean energy sources. An opportunity exi ...

    SBIR Phase I 2023 Department of Energy
  8. Shared Mobility Optimizer

    SBC: TERRACITY LLC            Topic: C5610c

    In the United States, transportation is the leading source of emissions among major industries. This puts pressure on cities to optimize transportation infrastructures to meet decarbonization goals. City planners are required to ingest data from a variety of sources and balance a wide array of priorities ranging from mobility and equality to safety and sustainability. Making decisions for optimal ...

    SBIR Phase I 2023 Department of Energy
  9. The BladeRunner Solution for Aquaculture Sustainability

    SBC: BladeRunner Energy, Inc.            Topic: C5614d

    C56-14d-273410Aquaculture has been identified as essential for feeding the world as the population increases towards nine billion by 2050. While aquaculture often comes with environmental challenges, future growth must be done sustainably and equitably. Marine renewable energy (MRE) to power aquaculture is one of the key strategies to meet this growth responsibly. Marine hydrokinetic energy offers ...

    SBIR Phase I 2023 Department of Energy
  10. Advanced Battery Controls for Grid and Customer Value

    SBC: Extensible Energy, Inc.            Topic: C5609b

    Aggressive decarbonization and electrification scenarios require a 3000-fold increase in grid-tied storage assets. Grid-tied batteries can only contribute to this challenge if control methods and technology improve dramatically. While grid-scale and residential battery markets are growing rapidly, deployment in small commercial buildings lags significantly. Current projects in this market segment ...

    SBIR Phase I 2023 Department of Energy
US Flag An Official Website of the United States Government