You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
LOCAETA: Local Climate Air Emissions Tracking Atlas
SBC: CARBON SOLUTIONS LLC Topic: C5516cAir quality data from top-of-the-line platforms, such as satellites, are difficult to obtain without a high- level of technical knowledge. For this reason, local air quality patterns and trends are often inaccessible to disadvantaged communities (DACs). Many technologies that will be used for deep decarbonization of industrial and power facilities have the added co-benefit of reducing non-CO2 poll ...
SBIR Phase I 2023 Department of Energy -
NECTAR: The Negative CO2 Emission Transition Roadmap
SBC: CARBON SOLUTIONS LLC Topic: C5322cC53-22c-271119Meeting climate-stabilizing energy transition goals requires using hybrid-energy CO2 capture systems like Direct Air Capture (DAC) to remove billions of tonnes of CO2 from the atmosphere. Deploying this capacity will be difficult because it is complex and energy intensive infrastructure, and there must also be buy- in from communities living in locations best suited for it. The chall ...
SBIR Phase II 2023 Department of Energy -
CarbonWatch: Rock Physics-Based Machine Learning Solution for End-to-End Monitoring of CO2 Storage Site
SBC: Teverra LLC Topic: C5321dC53-21d-271370CCS is a key technology for the mitigation of greenhouse gas emissions. Finding suitable geological storage sites, demonstrating effective CO2 containment, and establishing long-term monitoring of storage reservoirs are paramount to effective and safe storage of CO2. The risk of CO2 leakage can be reduced through real- time monitoring and early prediction of possible leaks. Early pre ...
SBIR Phase II 2023 Department of Energy -
Decarbonized Bio-based 2-Methylfuran Manufacturing in America for Sustainable Domestic Bio-Economy
SBC: RIKARBON INC Topic: C5610d2-Methylfuran (2MF) is a versatile non-food biomass derived low-carbon number performance advantaged bio-product. It is used for manufacturing green solvent (2-methyltertrahydrofuran (2MeTHF)), UpSycal?oils that RiKarbon is manufacturing for end-use natural and sustainable cosmetics and lubricants, and chemical/pharmaceutical intermediates. Currently fossil-based incumbent solvents such as tetrahy ...
SBIR Phase I 2023 Department of Energy -
Heat-Sweep Monitoring with Bubbled Water Seismic Imaging
SBC: Teverra LLC Topic: C5621aIn a geothermal reservoir, injected water flows through certain fluid pathways such as natural or induced fractures connecting injection and production wells to harvest the thermal energy from surrounding rocks. The spatial distribution and temporal movement of the fluid in the reservoir is the determining factor of the heat-sweep efficiency. Currently, monitoring of the heat-sweep efficiency is m ...
SBIR Phase I 2023 Department of Energy -
Development of New Metallization Pastes for Front-Side of Tunnel Oxide Passivated Contact Crystalline Silicon Solar Cells
SBC: ADVANCED MATERIAL ANALYSIS TECHNOLOGY LLC Topic: C5615fAMA Tech is developing a cutting-edge metallization paste for the front side of tunnel oxide passivated contact (TOPCon) crystalline silicon solar cells, which is expected to improve TOPCon solar cell efficiency significantly. This development has the potential to disrupt the photovoltaic industry, as even a small increase in cell efficiency could replace current passivated emitter and rear cell ( ...
SBIR Phase I 2023 Department of Energy -
Shared Mobility Optimizer
SBC: TERRACITY LLC Topic: C5610cIn the United States, transportation is the leading source of emissions among major industries. This puts pressure on cities to optimize transportation infrastructures to meet decarbonization goals. City planners are required to ingest data from a variety of sources and balance a wide array of priorities ranging from mobility and equality to safety and sustainability. Making decisions for optimal ...
SBIR Phase I 2023 Department of Energy -
Next Generation Microlayer Annular Co-Extrusion
SBC: Guill Tool & Engineering Co, Inc. Topic: C5620cAnnular extruded plastics are in everything from fuel lines, hoses, pipes, and wires to catheters, medical tubing, and stents and makes up about ? of the $200B extruded plastics market. Extrusion manufacturing is a major processor of the $600B raw plastics industry, which produces 380 million metric tons of material each year. The production of these materials accounts for 4% of oil consumption an ...
SBIR Phase I 2023 Department of Energy -
Torsional Resonator System for the Simultaneous Measurement of Density and Viscosity at High Temperature
SBC: STF TECHNOLOGIES LLC Topic: C5512cWe propose to develop a robust, accurate multi-frequency torsional resonator system for the simultaneous measurement of density and viscosity of molten salts at high temperature. The goal of the project is to develop a stand-alone resonator system that is accurate, precise and robust, and therefore can be used as the basis for a laboratory instrument as well as an on-line process monitoring sensor ...
STTR Phase I 2023 Department of Energy -
Development Of Yeast Strains for Production of Oleochemicals
SBC: SOUTHEASTERN BIOCHEMICALS, INC. Topic: C5520aGlobally, more than 350 million metric tons of plastic polymers are produced annually, and their production is anticipated to quadruple by 2050. As much as three quarters of this material is single use, and only a small proportion is currently recycled. In 2018, 36 million tons of plastic waste were generated in the United States and 24 percent of that waste was recycled or incinerated. The remain ...
STTR Phase I 2023 Department of Energy