You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS.
SBC: Aquidneck Management Associate Topic: N/ATHE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS. THE RESEARCH WILL ADDRESS ALL FACTORS THAT AFFECT SOFTWARE COSTS FROM A FUNCTIONAL STANDPOINT AS OPPOSED TO THE TRADITIONAL LINES-OF-CODE (PROGRAM SIZE) APPROACH. THE FACTORS WILL BE TRANSLATED INTO A MODEL THAT EMPHASIZES THE IMPORTANCE OF IN ...
SBIR Phase I 1983 Department of DefenseAir Force -
PRIMARY COOLANT RADIONUCLIDE CHARACTERIZATION, MODELLING AND REDUCTION
SBC: Atlan-tech Inc Topic: N/AN/A
SBIR Phase I 1983 Department of Energy -
SUNLIGHT DISTRIBUTION IN REMOTE INTERIOR LOCATIONS USING A MULTI-AXIS SUNTRACKER AS A LIGHT SOURCE
SBC: Bennett-ringrose-wolsfeld- Topic: N/AN/A
SBIR Phase I 1983 Department of Energy -
NEAR-MILLIMETER WAVE FERRITE MATERIALS AND COMPONENTS RESEARCH
SBC: Electromagnetic Sciences Inc Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
REDUCE THE VEE-LOCK JOINT TO ITS MOST COST EFFECTIVE MANUFACTURING METHODS
SBC: Interlock Design And Topic: N/ATHE VALUE OF LIGHTWEIGHT\HIGH STRENGTH TRAIGLAR TRUSS STRUCTURAL MEMBERS ARE RECOGNIZED FOR THERE STRENGTH AND DESIGN EFFICIENCY.MULTIPLE SECTIONS MAY BE JOINED TOGETHER WITHOUT THE USE OF TOOLS USING A VEELOCK JOINT ATTACHED TO THE ENDS OF THE TRUSS. THE VEELOCK JOINT WILL CONNECT TO ITSELF INSTANTLY PROVIDING A LONG SPAN OF TRUSS. QUICK- CONNECT\DISCONNECT VEELOCK TRUSS STRUCTURES WOULD HAVE BRO ...
SBIR Phase I 1983 Department of DefenseArmy -
THE OBJECTIVE OF THE PHASE I RESEARCH IS TO STUDY THE DEVELOPMENT OF VARIOUS TYPES OF LOW NOISE 44GHZ RECEIVER FRONT ENDS, AND TO IDENTIFY DEVELOPMENTAL DIFFICULTIES AND TECHNICAL RISKS ASSOCIATED WITH EACH DESIGN.
SBC: Millimeter Wave Technology, Topic: N/ATHE OBJECTIVE OF THE PHASE I RESEARCH IS TO STUDY THE DEVELOPMENT OF VARIOUS TYPES OF LOW NOISE 44GHZ RECEIVER FRONT ENDS, AND TO IDENTIFY DEVELOPMENTAL DIFFICULTIES AND TECHNICAL RISKS ASSOCIATED WITH EACH DESIGN. A HIGHLY RELIABLE, SPACE QUANTIFIABLE, LOW NOISE 44GHZ IS RECEIVER NEEDED. THE STUDY WILL ESTABLISH THE OPTIMUM COURSE TOWARD THE DEVELOPMENT OF THE DESIRED RECEIVER. ONE PRINCIPAL OUTP ...
SBIR Phase I 1983 Department of DefenseAir Force -
SEA WATER BATTERIES
SBC: Stam Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency