You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASI PROPOSES A RESEARCH METHODOLOGY FOR THE PURPOSE OF MAXIMIZING THE SEARCH FOR AND THE EXTRACTION OF NEW CONCEPTS AND INNOVATIONS IN THE AREA OF EXTENDING THE CAPABILITIES OF THE HUMAN IN AERONAUTICAL/ SPACE SYSTEMS THROUGH DESIGNING, CONDUCTING,

    SBC: Anticipatory Sciences Inc            Topic: N/A

    ASI PROPOSES A RESEARCH METHODOLOGY FOR THE PURPOSE OF MAXIMIZING THE SEARCH FOR AND THE EXTRACTION OF NEW CONCEPTS AND INNOVATIONS IN THE AREA OF EXTENDING THE CAPABILITIES OF THE HUMAN IN AERONAUTICAL/ SPACE SYSTEMS THROUGH DESIGNING, CONDUCTING, RUNNING, AND MONITORING OF A FUTURISTS/RESEARCH WORKSHOP. THE PROPOSED METHODOLOGY INCLUDES: 1) THE USE OF ASI DESIGNED OR REFINED FUTURIST TOOLS AND M ...

    SBIR Phase I 1985 Department of DefenseAir Force
  2. GAASP TOP SOLAR CELLS FOR INCREASED SOLAR CONVERSION EFFICIENCY

    SBC: ASTROPOWER, INC.            Topic: N/A

    GAASP SOLAR CELLS PLACED ON TOP OF CONVENTIONAL SILICON SOLAR CELL ARRAYS CAN INCREASE THE ENERGY CONVERSION EFFICIENCY OF THE SYSTEM AS MUCH AS 100%. ASTROPOWER DIVISION OF ASTROSYSTEMS, INC. PROPOSES TO DEVELOP A HIGH BAND GAP TOP SOLAR CELL FOR ATTACHMENT TO CONVENTIONALS ILICON SOLAR CELLS. TRANSPARENT GAP SUBSTRATES WILL BE USED WITH EPITAXIALLY GROWN LAYERS OF GAASPH HAVING A BAND GAP OF 1.7 ...

    SBIR Phase II 1985 Department of DefenseAir Force
  3. DEVELOPMENT OF A SENSITIVE, RAPID CHEMICAL/BIOLOGICAL AGENT DETECTOR

    SBC: SURMODICS, INC.            Topic: N/A

    THE RAPID DEVELOPMENT OF BIOTECHNOLOGY HAS MADE IT IMPERATIVE TO DETECT BIOHAZARDS WHICH MAY BE ENCOUNTERED INI STRATEGIC AREAS OF AIR FORCE OPERATIONS. THE RELEASE OF BIOLOGICAL/CHEMICAL WARFARE AGENTS IN A DEEP BASE WOULD PRESENT A SIGNIFICANT THREAT. IN PHASE I OF THIS PROPOSAL, WE WILL DEVELOP A QUALITATIVE METHOD OF DETECTING LOW CONCENTRATIONS OF AIRBORNE CHEMICAL AND BIOLOGICAL AGENTS. THIS ...

    SBIR Phase II 1985 Department of DefenseAir Force
  4. ENZYME IMMUNOASSAY FOR T-2 TETRAOL

    SBC: SURMODICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseArmy
  5. STABILIZATION OF PROTEINS BY CROSSLINKING

    SBC: SURMODICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseArmy
  6. MICROCOMPUTER SYSTEMS HAVE THE POTENTIAL OF AIDING THE OPERATIONS RESEARCH PROFESSIONALS ENGAGED IN LOGISTICS APPLICATION IN THE NAVY AND IN OTHER MILITARY, GOVERNMENT AND COMMERCIAL OPERATIONS.

    SBC: Daina            Topic: N/A

    MICROCOMPUTER SYSTEMS HAVE THE POTENTIAL OF AIDING THE OPERATIONS RESEARCH PROFESSIONALS ENGAGED IN LOGISTICS APPLICATION IN THE NAVY AND IN OTHER MILITARY, GOVERNMENT AND COMMERCIAL OPERATIONS. THE COMPLEXITY OF THE PROBLEMS ENCOUNTERED AND THE LIMITATIONS OF MICROCOMPUTER HARDWARE AND SOFTWARE HAVE PREVENTED THEIR USE IN THE PAST. THE PROPOSED EXPLORATORY DEVELOPMENT WILL CONCENTRATE ON THE SOFT ...

    SBIR Phase I 1985 Department of DefenseNavy
  7. HEAT EXCHANGE MATRIX

    SBC: Elanco Inc.            Topic: N/A

    HEAT EXCHANGE MATRIX THE FUNCTION OF A HEAT EXCHANGER IS DEPENDENT UPON THE AREA OF EXPOSURE TO THE FLUIDS IN PROCESS. FINS ARE COMMONLY USED TO INCREASE EXTERNAL SURFACE AREAS. TO EXTEND THE INNER SURFACE OF A TUBE OR VESSEL IS MORE DIFFICULT AND THERE IS CURRENTLY NO COST EFFECTIVE METHOD TO DO SO. THIS REDEARCH IS TO DEVELOP THE USE OF A MATRIX COMPOSED OF SMALL, HOLLOW, METAL CYLINDERS, BRAZED ...

    SBIR Phase II 1985 Department of DefenseArmy
  8. CONTROL-

    SBC: JONAS, INC.            Topic: N/A

    CORROSION, CONTAMINATION, AND SCALE FORMATION CAUSED BY IMPURITIES IN WATER AND STEAM IN THE NUCLEAR POWER REACTOR CYCLES ARE MAJOR AND COSTLY PROBLEMS OF THE US UTILITY INDUSTRY. CORROSION CRACKING AND DENTING OF THE PRESSURIZED WATER REACTOR (PWR) CYCLE STEAM GENERATOR TUBES AND STRESS CORROSION OF THE BOILING WATER REACTOR (BWR) PIPING AND OF TURBINE DISCS ARE A FEW EXAMPLES OF THE CORROSION PR ...

    SBIR Phase I 1985 Department of Energy
  9. THE DEVELOPMENT OF HIGH ELECTRICAL GRADIENT, DC ACCELERATOR TUBES WITH ELECTRICAL BREAK- DOWN PROTECTION

    SBC: Sysmed Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Energy
US Flag An Official Website of the United States Government