You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Distributed Portal and Virtual Testbed for ATR/Fusion Algorithms

    SBC: COGNITECH CORPORATION            Topic: N/A

    This project will create a distributed portal and virtual testbed for ATR/Fusion algorithms. The investigators will develop a CORBA architecture and software tools to support profiling of distributed software processes, workflow task management, andinterfaces to algorithm and performance measure repositories. The investigators will design and create databases for algorithm inputs, algorithm outp ...

    SBIR Phase II 2001 Department of DefenseAir Force
  2. High Speed Digital Bus Isolator for Space

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    NVE will produce and package IC's that monolithically integrate high speed GMR signal isolators into prototype high-speed 74245 type transceivers and 74573 type logic latches. Commercial high-speed data bus interfaces between microcontroller basedsubsystems have not been galvanically isolated due to performance, size and cost constraints. These interfaces would benefit from the inclusion of mono ...

    SBIR Phase II 2001 Department of DefenseAir Force
  3. NDI for Diffusion Bonded Components

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    It is proposed to use spin dependent tunneling (SDT) and giant magnetoresistance (GMR) magnetic sensors and eddy current techniques for Non-Destructive Inspection (NDI) to detect flaws in various metallic components including cracks around rivet holes andfailed bonds in diffusion bonded components. This Phase II proposal is directed towards designing, optimizing, manufacturing, and demonstrating s ...

    SBIR Phase II 2001 Department of DefenseAir Force
  4. InAs/GaInSb Superlattice for Very Long Wavelength Infrared Applications

    SBC: SVT ASSOCIATES INC            Topic: N/A

    GaInSb/InAs superlattices show great promise as materials for use in very long wavelength infrared (VLWIR) detectors. This III-V compound offers advantages over current HgCdTe technology in both anticipated performance level and ancillary support system(e.g. cryogenic cooling) costs. Due to its piezoelectric characteristic, (111)-oriented superlattice lowers the effective bandgap energy when com ...

    SBIR Phase II 2001 Department of DefenseAir Force
  5. Computational Modeling of Remelting Processes for Ingot Casting of High-Performance Alloys

    SBC: INNOVATIVE RESEARCH, INC.            Topic: N/A

    The overall goal of the proposed research is to develop a comprehensive, efficient, and well validated model of various remelting processes used for the production of ingots of superalloys and titanium alloys. Phase I research has demonstrated thefeasibility and the validity of developing a unified computational model for efficient and accurate prediction of AC and DC electromagnetics, fluid flow, ...

    SBIR Phase II 2001 Department of DefenseAir Force
  6. Advanced Intrusion Detection Techniques

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: N/A

    The Army Chemical Stockpile Disposal Program (CSDP) is charged withdestroying the nation's deteriorating stockpile of highly toxic chemicalagents and munitions. This has proven to be a technically challenging,lengthy (20 year projected effort) and costly ($15 billion and increasing)endeavor. Incineration technology is the basis for most of the chemicaldemilitarization activities. Improved incinera ...

    SBIR Phase II 2001 Department of DefenseArmy
  7. High Speed Valve

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    Spin-dependent-tunneling (SDT) sensors are emerging as a microelectronics-based magnetic-sensor technology for the broadband detection of low-level fields produced by objects such as military or commercial vehicles. The sensors offer the potential of smallsize, low cost, low power, and low-field resolution. The sensitivity of the devices is high, however they exhibit a significant

    SBIR Phase II 2001 Department of DefenseArmy
  8. Innovative Image Reconstruction for Wide Field-of-View Anisoplanatic Imaging through Turbulence

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    This Small Business Innovation Research Phase II project,

    SBIR Phase II 2001 Department of DefenseArmy
  9. Scramjet Combustor Simulations using Reduced Chemical Kinetics for Practical Fuels

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: N/A

    Computational fluid dynamics (CFD) is playing an increasingly important role in U.S. industry. In the aerospace industry, where the cost of construction and operation of sub-scale and prototype units increases significantly with the increase in size andspeed of aircraft, CFD plays an important role as an adjunct to experimentation in reducing the costs of testing and scale-up and the time to take ...

    SBIR Phase II 2001 Department of DefenseAir Force
  10. Wideband Radio Frequency Distribution System (RFDS)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: N/A

    This Phase II SBIR effort will build and demonstrate a full-scaleprototype of NADIA, a software-based automated network faultdiagnosis tool. NADIA will automatically perform real-timeanalysis of the operational data within shipboard networks topinpoint element failures when they occur. It will provideguidance to the shipboard network administrator to perform thenecessary corrective actions needed ...

    SBIR Phase II 2001 Department of DefenseNavy
US Flag An Official Website of the United States Government