You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Increasing Water Use Efficiency by Addressing Sensor Cost Barriers Using Novel Technology
SBC: TRANSCEND ENGINEERING AND TECHNOLOGY, LLC Topic: 96The project objective is to greatly reduce the cost of monitoring soil water content in highly-resolved vertical profile to promote increased adoption of more efficient water management tools. Cost is the most significant barrier to adoption of sophisticated data-driven irrigation management in permanent agriculture. Highly-resolved vertical soil water profiles are needed to learn soil-specific hy ...
SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Document Generation Platform (DGP)
SBC: Inkit Inc. Topic: AF20CTCSO1Currently, defense-wide USG organizations can take weeks to compile critical reports, assembling information and data using the “cut and paste” method. These critical reports synthesize newly available information to assist in decision-making on both a po
SBIR Phase II 2023 Department of DefenseAir Force -
Shared Mobility Optimizer
SBC: TERRACITY LLC Topic: C5610cIn the United States, transportation is the leading source of emissions among major industries. This puts pressure on cities to optimize transportation infrastructures to meet decarbonization goals. City planners are required to ingest data from a variety of sources and balance a wide array of priorities ranging from mobility and equality to safety and sustainability. Making decisions for optimal ...
SBIR Phase I 2023 Department of Energy -
An Innovative, Authentic, and Anatomically-Correct Female Casually Care Simulator with Mixed Reality (MR) Capabilities
SBC: INNOVATIVE DESIGN LABS INC Topic: A234009Innovative Design Labs (IDL) is answering the Army Applications Laboratory (AAL) SPARTN Program’s call to develop an anatomically correct female manikin with Mixed Reality (MR) capabilities. Significance: The funding opportunity references make note of lower survivability rates for female casualties in comparison to males: 35.9% vs 17% (Operation Enduring Freedom) and 14.5% vs 12% (Operation Ira ...
SBIR Phase I 2023 Department of DefenseArmy -
Artemis (Augmented Reality To Enhance Medical Instruction for Soldiers)
SBC: ARCHITECTURE TECHNOLOGY INC Topic: A234009The Army, and the DoD in general, has a gender casualty survivability gap problem: female casualties have a significantly lower survival rate than male casualties. Reasons for this gender gap include: training is done largely with male manikins and female abdominal and chest wounds are not identified or treated properly because of hesitancy in exposing these parts of the female body. The Army ...
SBIR Phase I 2023 Department of DefenseArmy -
MADEIRA: Multi-Agent Debloating Environment to Increase Robustness in Applications
SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC Topic: N23AT009SIFT and the University of Southern California's Information Sciences Institute (USC/ISI) propose to develop the Multi-Agent Debloating Environment to Increase Robustness in Applications (MADEIRA). MADEIRA will apply AI/ML techniques to learn how to apply diverse debloating tools, automatically reducing the attack surfaces of full systems that may include firmware, OS, container, and application-l ...
STTR Phase I 2023 Department of DefenseNavy -
Foreign Object Retrieval System (FORS)
SBC: ARCHITECTURE TECHNOLOGY INC Topic: AF2310014Flightline workers currently perform foreign object debris (FOD) checks prior to every airfield entry, which may be adversely affected by various external factors. Any missed foreign object (FO) presents a significant hazard to aircraft operating on the a
SBIR Phase I 2023 Department of DefenseAir Force -
A Cost-Effective 3D Wildlife Tracking System
SBC: WILDLIFE IMAGING SYSTEMS LLC Topic: C5617aThere are many issues that a wind developer must consider when siting a wind project, but one that has become increasingly pressing in the U.S. is the effect of turbines on local wildlife. New onshore wind development is occurring across the entire the U.S. and has brought wind plants into greater conflict with wildlife, especially bats. The burgeoning U.S. offshore wind industry is also contendin ...
SBIR Phase I 2023 Department of Energy -
Army Tech Marketplace
SBC: UNLABEL INNOVATION LLC Topic: A234008Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Strategic Radiation Hardened FPGA
SBC: TRUSTED SEMICONDUCTOR SOLUTIONS INC Topic: N231073Development of a strategic radiation hardened FPGA with secure boot through MRAM. The FPGA will be demonstrated on state-of-the-practice foundry technology. The FPGA architecture will be developed to support a future port to state-of-the-art foundry technology. The FGPA will be architected to support a chiplet embodiment which will enable rapid reconfiguration of strategic rad hard FPGA products ...
SBIR Phase I 2023 Department of DefenseNavy