You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SUNLIGHT DISTRIBUTION IN REMOTE INTERIOR LOCATIONS USING A MULTI-AXIS SUNTRACKER AS A LIGHT SOURCE

    SBC: Bennett-ringrose-wolsfeld-            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy
  2. REDUCE THE VEE-LOCK JOINT TO ITS MOST COST EFFECTIVE MANUFACTURING METHODS

    SBC: Interlock Design And            Topic: N/A

    THE VALUE OF LIGHTWEIGHT\HIGH STRENGTH TRAIGLAR TRUSS STRUCTURAL MEMBERS ARE RECOGNIZED FOR THERE STRENGTH AND DESIGN EFFICIENCY.MULTIPLE SECTIONS MAY BE JOINED TOGETHER WITHOUT THE USE OF TOOLS USING A VEELOCK JOINT ATTACHED TO THE ENDS OF THE TRUSS. THE VEELOCK JOINT WILL CONNECT TO ITSELF INSTANTLY PROVIDING A LONG SPAN OF TRUSS. QUICK- CONNECT\DISCONNECT VEELOCK TRUSS STRUCTURES WOULD HAVE BRO ...

    SBIR Phase I 1983 Department of DefenseArmy
US Flag An Official Website of the United States Government