You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Plasma Electrolytic Oxidation (PEO) Coatings as Superior Thermal Barriers for Engine Pistons

    SBC: IBC Materials & Technologies, LLC            Topic: 13c

    Automobiles (cars and trucks for instance) are the predominant mode of transportation in the United States. These vehicles are powered by internal combustion engines that consume fossil fuels such as gasoline. Improving the efficiency of internal combustion engines is an ongoing challenge of enormous impact to energy consumption in the world. In order to improve engine efficiency and thus fuel eco ...

    SBIR Phase I 2019 Department of Energy
  2. Hydrothermal Catalysis Flow Process to Convert Brown Grease into Green Gasoline, Green Jet and Green Diesel Fuels

    SBC: SARTEC CORPORATION            Topic: 08a

    The primary challenges for creating renewable fuels are the ability to process inexpensive non-food feedstocks into biofuels that meet all quality specification, perform indistinguishably from petroleum-based fuels and are compatible with current infrastructure.Our Phase I project demonstrated the feasibility of producing biofuels from waste greases using a novel hydrothermal, continuous-flow cata ...

    SBIR Phase II 2019 Department of Energy
  3. Engineering Analysis and Design of CO2 Geothermal Power System to Provide Dispatable Geothermal Electricity Generation and Grid-Scale Energy Storage

    SBC: TERRACOH INC            Topic: 11b

    In topic 11.b, Dispatchable Geothermal Operations, DOE seeks to enable more widespread deployment of geothermal as a dispatchable energy source.TerraCOH’s CO2 Plume Geothermal (CPG™) and Earth Battery™ technologies are ideally suited to meet DOE’s needs.Conventional geothermal power technology has generally been limited to use as a baseload power source, but with increasing penetration of ...

    SBIR Phase II 2019 Department of Energy
  4. SAMS: Secure Additive Manufacturing Supply chain

    SBC: INDIANA TOOL & MFG. CO., INC.            Topic: AF182004

    Long value chains are among the biggest security issue in manufacturing for Industry 4.0. This is the case for all manufacturing but is especially critical in the military complex. In the USA, regulations trying to manage the situation, such as DFARS 252.204-7012, utilize Information Technology (IT) paradigms that don’t reflect Operation Technology’s (OT) unique circumstances and foc ...

    SBIR Phase I 2019 Department of DefenseAir Force
  5. Modeling Tools for the Drilling of Polymer Matrix Composites (PMCs)

    SBC: Third Wave Systems, Inc.            Topic: AF182098

    In this Small Business Innovation Research Phase I program, Modeling Tools for the Drilling of Polymer Matrix Composites (PMCs), Third Wave Systems (TWS) will develop and demonstrate innovative multi-scale modeling tools for the drilling of polymer matrix composites (PMCs), which is enabled by integration of advanced material constitutive models, detailed-level finite element analysis (FEA), and N ...

    SBIR Phase I 2019 Department of DefenseAir Force
  6. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: Sensorhound, Inc            Topic: AF183005

    The objective of this SBIR Phase I proposal is to investigate the feasibility of a pilot deployment of our secure high-value asset monitoring solution in the US Air Force. High-value assets such as aircraft engines and weapon systems are misplaced or subjected to environmental conditions leading to physical damage/corrosion due to infrequent manual monitoring. While many COTS monitoring devices ar ...

    SBIR Phase I 2019 Department of DefenseAir Force
  7. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: Collaboration.Ai, LLC            Topic: AF183005

    Data analysis & optimization of the USAF innovation ecosystem (people, products & ideas) that interact with, submit products and the hundreds of thousands of people not tapped into for support the future success of the USAF

    SBIR Phase I 2019 Department of DefenseAir Force
  8. “Black Box� RF Sat-Link for Mission Success, Risk Mitigation, and Space Debris

    SBC: NearSpace Launch Inc.            Topic: AF183005

    The proposed NSL Black Box redundant radio link (Globalstar constellation) is a very timely topic for the AF as a Dual Purpose Technology. The small and autonomous Black Box solution with its 24/7 global coverage (latency of seconds) can greatly increase performance, reduce risk with redundancy, and help with orbital debris tracking. The Black Box technology has recently been proven on 14 satellit ...

    SBIR Phase I 2019 Department of DefenseAir Force
  9. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: Trek10 Inc.            Topic: AF183005

    Entering its 70th year of operation and providing national security, Air Force systems generating data are growing exponentially. Data generated from legacy and fifth generation aircraft, imagery from UAVs and satellites, and situational data from the battlefield are but a few examples. The volume of data being ingested puts massive pressure on traditional IT infrastructure and ultimately, results ...

    SBIR Phase I 2019 Department of DefenseAir Force
  10. Secure Cockpit-to-Ground Wireless Data Transfer

    SBC: INDIANA MICROELECTRONICS, LLC            Topic: AF183013

    This project will develop a Millimeterwave, low-power transceiver for secure, high-speed wireless data transfer between an aircraft cockpit and a ground terminal. The wireless transceiver will replace a cumbersome, unreliable data cable that is currently used for cockpit-to-ground communications. The transciver will be small enough to plug directly into the ports of the cockpit computer and ground ...

    SBIR Phase I 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government