You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Proposed Project Title Atlantis AI Based Long Range Space Weather Prediction System

    SBC: Atlantis Industries, Inc.            Topic: 95

    To date, no realizable method of predicting the occurrence or magnitude of a Solar Energetic Particle (SEP) event has been developed. There are multiple models currently available in the Community Coordinated Modeling Center (CCMC) through Goddard Space Flight Center that attempt to provide timely and accurate event propagation (e.g.MAG4, Enlil, and SEPMOD). None of these have yet achieved the goa ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Continuous Correlations for Complete Boiling Curves of Cryogenic Fluids

    SBC: CREARE LLC            Topic: T14

    Future space exploration missions will rely on in situ production, storage, and transfer of cryogenic rocket propellants. Engineers need accurate and efficient modeling tools to design the next generation of lightweight, efficient cryogenic propellant management devices and processes. Predictive models for key fluid dynamics and heat transfer behavior must be tailored for use with cryogenic propel ...

    STTR Phase II 2023 National Aeronautics and Space Administration
  3. Nonplanar Spaceborne Additively Manufactured Electronics

    SBC: MICRO-PRECISION TECHNOLOGIES, INC.            Topic: T12

    Micro-Precision Technologies, Inc. (MPT), in partnership with the Center for Advanced Microelectronics Manufacturing (CAMM) at Binghamton University, will develop a commercially-ready process for spaceborne additively manufactured electronics (AME) combining the ruggedness and reliability of MPTrsquo;s thick film ceramic technology with the design freedom of CAMMrsquo;s aerosol jet printing techno ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  4. SurveyorBot: A Proof of Value Precursor Mission for Launch / Landing Pad Geotechnical Assessment

    SBC: EXPLORATION ARCHITECTURE CORPORATION            Topic: T7

    Building lunar infrastructure requires moving regolith in unprecedented quantities both to produce level areas,nbsp;cutting in some areas, filling in others, for the infrastructurersquo;s construction, It also requires excavation to provide regolith feedstock for beneficiation and in situ manufacturing of the materials from which much of the infrastructure is to be built.Regolith handling characte ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  5. 3D Printing of High Temperature Thermoset Foams for Space Vehicular Thermal Protection Systems

    SBC: RE3D, INC.            Topic: T12

    nbsp;Based on the knowledge and expertise gained in partnership with the University of Tennessee at Knoxville (UTK) during the NASA/STTR Phase I work, re:3D proposes the development of a pilot system for the deposition of a phenolic foam TPS surface onto a scaled demonstration article in parallel with refinements and improvements to the foamrsquo;s material characteristics.The Phase II research ac ...

    STTR Phase II 2023 National Aeronautics and Space Administration
  6. Mission Operations Digital Twin for Decision Making(MODT)

    SBC: SIMCRAFT LLC            Topic: T11

    The proposed innovation is to design and demonstrate an End-to-End Space Mission Operations Digital Twin (MODT) Platform for collaborative multi-disciplinary analysis and decision making in Mission Control.nbsp; This platform will provide situational awareness across the flight control team and crew, through a hyper-realistic, multi-user, multi-modal virtual environment that integrates existing (a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  7. Improved Gradient Modeling at Interfaces for Accurate CFD of Cryogenic Propellant Tanks

    SBC: CREARE LLC            Topic: T14

    Cryogenic propellant production, storage, and transport is critical for future space missions. Engineers need accurate tools to design the next generation of efficient, lightweight components and processes for cryogenic fluid management (CFM). Computational fluid dynamics (CFD) simulations are key for these efforts, but current commercial codes struggle to capture key behavior at liquid-vapor inte ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  8. Augmented Reality Navigation Application For Space Habitats

    SBC: ASTER LABS, INC.            Topic: T11

    This program will develop an innovative Augmented Reality Navigation (ARNAV) application to help guide astronauts through important tasks within and about space habitats that require navigation and guidance capabilities. Using advanced vision and inertial processing combined with novel Rapidly-exploring Random Tree* (RRT*) algorithms for path planning and Random Finite Set (RFS)-based localization ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  9. Space Qualified, 3D-Printed, Electronic Assembly Demonstration (SPEAD) Printed Circuit Boards

    SBC: NANOHMICS INC            Topic: T12

    Recent advances in techniques for Additively Manufactured Electronics (AME) have the potential to produce electronics assemblies that are uniquely compact and conformable, but these techniques have not been proven effective for space applications. Designing and fabricating printed circuit boards (PCBs) that can meet rigorous space flight qualifications specifications is challenging. There are curr ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  10. Conveyance, Filtering, and Feed System for Lunar Brickbot Technology Demonstrator for Landing Pad Construction

    SBC: ASTROPORT SPACE TECHNOLOGIES, INC.            Topic: T12

    Our Brickbot conveyance system comprises of bucket drums and annbsp;electromagnetic sieving and filtering system mounted on a robotic mobility platform used for initial risk reduction test demonstrations. Anbsp;method to scoop the uncompacted top surface layer of lunar regolith is employed to depositnbsp;acquired regolith directly over the top of the robotrsquo;s shroud cover which is modified to ...

    STTR Phase I 2023 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government