You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN EXPENDABLE DEVICE FOR MEASURING SUPERCOOLED LIQUID WATER IN CLOUDS

    SBC: Atek Data Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  2. A SIMPLE, RAPID MEANS FOR IDENTIFYING THE MICROBIAL OR VIRAL PATHOGEN CAUSING DISEASE WOULD ALLOW FOR EARLY AND EFFECTIVE TREATMENT AND PREVENTIVE MEASURES FOR HUMANS FOUND IN SITUATIONS WITHOUT READY ACCESS TO ADVANCED DIAGNOSTIC FACILITIES AND

    SBC: SURMODICS, INC.            Topic: N/A

    A SIMPLE, RAPID MEANS FOR IDENTIFYING THE MICROBIAL OR VIRAL PATHOGEN CAUSING DISEASE WOULD ALLOW FOR EARLY AND EFFECTIVE TREATMENT AND PREVENTIVE MEASURES FOR HUMANS FOUND IN SITUATIONS WITHOUT READY ACCESS TO ADVANCED DIAGNOSTIC FACILITIES AND EXPERTISE (E.G., NASA CREW MEMBERS, FIELD SOLDIERS AND CITIZENS OF SPARSELY POPULATED AND UNDERDEVELOPED AREAS). PATHOGEN IDENTIFICATION REQUIRES THE DETE ...

    SBIR Phase I 1983 National Aeronautics and Space Administration
  3. ACTIVITIES

    SBC: General Systems Group            Topic: N/A

    GSG HAS OBSERVED LIMITED SUPPORT OF MODERN PROGRAMMING PRACTICE BY DOD SOFTWARE CONTRACTORS DUE TO THE RISKS INVOLVED AND THE ABSENCE OF PAY-OFF DATA. CONTRACTORS ALSO HAVE A DIFFICULT TIME ACCRATELY ESTIMATING AND SCHEDULING QUALITY RELATED ACTIVITIES ON SOFTWARE OF QUALITY RELATED ACTIVITIES IN ORDER TO PROVIDE THE MODELS WHICH CAN BE USED TO (A) DETERMINE THE VALUE OF SUCH ACTIVITIES TO CONTRAC ...

    SBIR Phase I 1983 Department of DefenseArmy
  4. REDUCE THE VEE-LOCK JOINT TO ITS MOST COST EFFECTIVE MANUFACTURING METHODS

    SBC: Interlock Design And            Topic: N/A

    THE VALUE OF LIGHTWEIGHT\HIGH STRENGTH TRAIGLAR TRUSS STRUCTURAL MEMBERS ARE RECOGNIZED FOR THERE STRENGTH AND DESIGN EFFICIENCY.MULTIPLE SECTIONS MAY BE JOINED TOGETHER WITHOUT THE USE OF TOOLS USING A VEELOCK JOINT ATTACHED TO THE ENDS OF THE TRUSS. THE VEELOCK JOINT WILL CONNECT TO ITSELF INSTANTLY PROVIDING A LONG SPAN OF TRUSS. QUICK- CONNECT\DISCONNECT VEELOCK TRUSS STRUCTURES WOULD HAVE BRO ...

    SBIR Phase I 1983 Department of DefenseArmy
US Flag An Official Website of the United States Government