You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ecological Treatment of Blackwater for Onsite Non-potable Reuse Phase I Proposal

    SBC: SANITARY GREEN INCORPORATED            Topic: 1A

    Our research is focused on EPA SBIR Topic 1A: Decentralized wastewater treatment (septic system) technologies for intentional non-potable reuse. LeapFrog research aims to provide innovative decentralized water treatment for non-potable reuse and capture onsite for single-family residence scale. Across the country, growing demand for high-quality water is met with long term challenges due to drough ...

    SBIR Phase I 2023 Environmental Protection Agency
  2. Real Time Recycling Inventory Aggregation and Management Software

    SBC: CITY OF ROSES DISPOSAL & RECYCLING INC            Topic: 4B

    Our product will incentivize source separation of construction and demolition waste by capturing true weights of recoverable products and adjusting disposal pricing based upon percentage of recyclability. This holistic inventory aggregation and management system will allow material recovery facilities (MRFs) to accurately evaluate inbound waste by weight and track recovered materials inventories. ...

    SBIR Phase I 2023 Environmental Protection Agency
  3. Innovative Equipment Large Single Crystal CdZnTe Production for Long-Wave Infrared Detector Arrays

    SBC: STRUCTURED MATERIALS INDUSTRIES, INC.            Topic: MDA21013

    In this Phase II SBIR project, we will optimize the design and develop the growth processes and equipment to routinely produce large (through 150mm), high-quality, single-crystal cadmium zinc telluride (CdZnTe or CZT) bulk material suitable for the production of CZT substrates for producing larger and highest-performing long-wave infrared (LWIR) detector arrays. We are addressing these issues by i ...

    SBIR Phase II 2023 Department of DefenseMissile Defense Agency
  4. Parts Life, Inc. 20.2 Phase II Proposal

    SBC: PARTS LIFE INC            Topic: DLA202001

    For this Phase II, Parts Life, Inc. is proposing to improve product availability and increase competition through the development of Source Approval Requests (SAR) for NSNs 5330-00-992-1516 Seal Ring Metal, 5330-00-798-2704 Seal Ring Metal, 5330-00-796-9180 Gasket, 5331-01-010-2929 O-Ring, 5331-00-425-9124 O-Ring, 5331-00-618-3447 O-Ring, 4820-01-202-6339 Seat, Valve, 5310-00-164-1100 Wash ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. PLI Response to DLA232-001 NSN 5935-00-459-9640

    SBC: PARTS LIFE INC            Topic: DLA232001

    Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5935-00-459-9640, Connector, Receptacle, Electrical. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by a ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  6. PLI Response to DLA232-001 NSN 5330-00-242-6875

    SBC: PARTS LIFE INC            Topic: DLA232001

    Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5330-00-242-6875 Seal, Plain Encased. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by an ESA, Parts Li ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Innovative Equipment Large Single-Crystal CdZnTe Production for Long-wave Infrared Detector Arrays

    SBC: STRUCTURED MATERIALS INDUSTRIES, INC.            Topic: MDA21013

    In this SBIR project, we will optimize the design and develop the growth processes and equipment to routinely produce large, high-quality, single-crystal cadmium zinc telluride (CdZnTe or CZT) bulk material suitable for the production of CZT substrates for producing the highest-performing long-wave infrared (LWIR) detector arrays. Structured Materials Industries wished to improved manufacturing cr ...

    SBIR Phase I 2022 Department of DefenseMissile Defense Agency
  8. High Power, Single Mode, Diode Emitter for Directed Energy Applications

    SBC: Fuceltech Inc            Topic: MDA20004

    MDA is interested in developing single mode high power diode lasers with excellent beam quality and high efficiency and coherently combine them for high power output and use the coherently combined modules to build high power direct diode laser (HPDDL) systems capable of achieving upwards of 10-100 kW (dependent on the beam combining technique) of high output power while maintaining the beam quali ...

    SBIR Phase II 2022 Department of DefenseMissile Defense Agency
  9. Reverse Engineering Technical Data Packages for Development of Alternate Source of Supply for DLA NSNs

    SBC: PARTS LIFE INC            Topic: DLA183001

    In the Phase I effort, contract number SP4701-19-P-0032, Parts Life, Inc. utilized its proven SAR process to replicate Tool Set, Dome Nut, NSN 4920-01-284-0198. Using the company’s unique and revolutionary R.O.P.E.™ (Rapid Obsolescence Planning and Execution) process to create a complete technical and manufacturable drawing package, Parts Life provided a solution to a problem that has become i ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  10. PLI 20.2 Phase II

    SBC: PARTS LIFE INC            Topic: DLA202001

    In the Phase I effort, Parts Life, Inc. utilized its proven SAR process to replicate NSNs. Using the company’s unique and revolutionary R.O.P.E.™ (Rapid Obsolescence Planning and Execution) process to create a complete technical and manufacturable drawing package, Parts Life provided a solution to a problem that has become increasingly more critical. All the drawings, specifications, sources, ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government