The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. Low Light Short Wave Infrared Focal Plane Arrays

    SBC: VOXTEL, INC.            Topic: MDA15022

    Current focal plane array (FPA) technologies for imaging in low-light conditions in the short wave infrared (SWIR) are limited by poor quantum efficiency and/or poor noise characteristics. To address this need, a new SWIR-sensitive linear-mode avalanche photodiode detector array, will be optimized for low-light imaging, fabricated, and demonstrated. Unlike existing SWIRavalanche photodiodes (APDs) ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  2. Radiation-hardened Reconfigurable Digital Dual-band Infrared ROIC

    SBC: VOXTEL, INC.            Topic: MDA15019

    A 1280 x 1024, 12-micron-pitch format radiation-hardened dual-band digital infrared readout integrated circuit (ROIC) will be developed. The features of the reconfigurable adaptive detector integrated circuit (RadIC) include: low-noise in-pixel amplifiers, in-pixel analog-to-digital conversion (ADC), extended > 22-bit dynamic range with temporal-photon flux-rate encoding, high-rate readout, and as ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  3. 25kW 200kWh Energy Storage System based on All-iron Hybrid Flow Battery

    SBC: Energy Storage Systems, Inc.            Topic: DEFOA0000674

    This ARPA-E SBIR project is to research, design, construct and field trial a cost-effective and efficient 25kW 200kWh energy storage system based on the all-Iron Hybrid Flow Battery (IFB) technology. Energy Storage Systems Inc. (ESS) develops and commercializes grid-scale energy storage systems based on flow battery technologies. Applying its proprietary flow cell design, ESS has demonstrated a 4- ...

    SBIR Phase II 2015 Department of EnergyARPA-E
  4. Practical Roots of Trust for Mobile Devices

    SBC: Galois, Inc.            Topic: HSB0132002

    To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...

    SBIR Phase II 2014 Department of Homeland Security
  5. Practical Roots of Trust for Mobile Devices

    SBC: Galois, Inc.            Topic: HSB0132002

    To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...

    SBIR Phase I 2013 Department of Homeland Security
  6. Combining wave effects with radiance transport for IR scene generation

    SBC: LRK Associates            Topic: MDA11001

    The identification and tracking of objects of interest to the Ballistic Missile Defense System (BMDS) depends upon detection, measurement/classification, and visualization of the radiation emitted by these objects. Since BMDS operation is strongly tied to imagery, the input of synthetic imagery that resembles operational scenarios is one way to test its functionality. It is crucial that such s ...

    SBIR Phase I 2012 Department of DefenseMissile Defense Agency
  7. 25kW 200kWh Energy Storage System based on All-iron Hybrid Flow Battery

    SBC: Energy Storage Systems, Inc.            Topic: 1

    This ARPA-e SBIR project is to research, design, construct and field trial a cost-effective and efficient 25kW 200kWh energy storage system based on the all-Iron Hybrid Flow Battery (IFB) technology. Energy Storage Systems Inc. (ESS) develops and commercializes grid-scale energy storage systems based on flow battery technologies. Applying its proprietary flow cell design, ESS demonstrated a 4-fo ...

    SBIR Phase I 2012 Department of EnergyARPA-E
  8. 25kW 200kWh Energy Storage System based on All-iron Hybrid Flow Battery

    SBC: Energy Storage Systems, Inc.            Topic: 1

    This ARPA-e SBIR project is to research, design, construct and field trial a cost-effective and efficient 25kW 200kWh energy storage system based on the all-Iron Hybrid Flow Battery (IFB) technology. Energy Storage Systems Inc. (ESS) develops and commercializes grid-scale energy storage systems based on flow battery technologies. Applying its proprietary flow cell design, ESS demonstrated a 4-fo ...

    SBIR Phase II 2012 Department of EnergyARPA-E
  9. Wave Energy Harvesting System

    SBC: Peregrine Power LLC            Topic: 812SG

    The applicant will develop a wave energy harvesting system for NOAA buoys. It will ve entirely self-contained (no protruding elements), modular, scalable, and easily deployed. The system employs a unique, inertial mechanism that responds to acceleration forces created by waves. This mechanism will be combined with (1) a proprietary generator that is sensitive to very low levels of torque and ha ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  10. WEARABLE THERMOELECTRIC GENERATORS FOR FIRST RESPONDERS

    SBC: Perpetua Power Source Technologies, Inc.            Topic: HSB092008

    The human body is a near perfect energy generator. Demand for energy harvesting innovation, along with technology advances in thin film thermoelectric generators and highly efficient DC/DC boost circuitry now place wearable thermoelectric power harvesting within reach. The objective of Perpetua`s Phase II proposal is to deliver an energy harvesting system for first responder applications power ...

    SBIR Phase II 2011 Department of Homeland Security

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government