You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 25kW 200kWh Energy Storage System based on All-iron Hybrid Flow Battery

    SBC: ESS Tech, Inc.            Topic: DEFOA0000674

    This ARPA-E SBIR project is to research, design, construct and field trial a cost-effective and efficient 25kW 200kWh energy storage system based on the all-Iron Hybrid Flow Battery (IFB) technology. Energy Storage Systems Inc. (ESS) develops and commercializes grid-scale energy storage systems based on flow battery technologies. Applying its proprietary flow cell design, ESS has demonstrated a 4- ...

    SBIR Phase II 2015 Department of EnergyARPA-E
US Flag An Official Website of the United States Government