You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW-COST LIGHTWEIGHT HIGH TORQUE MOTORS FOR APPLICATIONS OVER A WIDE TEMPERATURE RANGE

    SBC: Advanced Materials Corp            Topic: N/A

    IRON-BASED RARE EARTH-BORON PERMANENT MAGNETS OF THE COMPOSITION FE14ND2B WHICH WERE DISCOVERED SEVERAL YEARS AGO POSSESS MAGNETIC ENERGY PRODUCTS EXCEEDING 40 MGOE. THE OPPORTUNITY EXISTS TO DESIGN ASYNCHRONOUS MOTOR WITH SUCH PERMANENT MAGNET MATERIALS. SINCE THE WEIGHT OF A MOTOR IS INVERSELY PROPORTIONAL TO THE ENERGY PRODUCT OF THE MAGNET, IT IS CLEAR THAT MOTORS DESIGNED FROM SUCH HIGH ENERG ...

    SBIR Phase II 1988 Department of DefenseMissile Defense Agency
  2. SCALEABLE PROCESS FOR CHEMICAL VAPOR DEPOSITION OF LARGE AREA HETEROEPITAXIAL BETA-SIC ON TIC USING GASES WITH 1:1 SI:C STOICHIO

    SBC: DIAMOND MATERIALS INC            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  3. SPACECRAFT HEAT REJECTION METHODS

    SBC: THERMACORE, INC.            Topic: N/A

    MANY NEAR-FUTURE MILITARY SATELLITES WILL HAVE POWER REQUIREMENTS OF FIVE TO TEN KILOWATTS. THIS REQUIREMENT IS EXPECTED TO GROW TO 100 KW OR MORE DURING THE NEXT TWENTY YEARS. THE MUCH HIGHER HEAT LOADS EXPECTED ON FUTURE SATELLITES WILL CAUSE THE RADIATOR PANELS TO BECOME A LARGE PART OF THE TOTAL SATELLITE MASS AND THEIR SIZE WILL AFFECT SPACECRAFT STABILITY AND CONFIGURATIONS. THIS PROPOSAL ID ...

    SBIR Phase II 1988 Department of DefenseMissile Defense Agency
  4. HIGH TEMPERATURE CAPILLARY PUMPED LOOP HEAT PIPE

    SBC: THERMACORE, INC.            Topic: N/A

    DESIGNS FOR SPACE BASED STRUCTURES ARE BECOMING INCREASINGLY LARGER AND MORE COMPLEX. AS THESE STRUCTURES GROW, THEIR LEVEL OF POWER CONSUMPTION IS ALSO INCREASING. TO SATISFY THIS DEMAND FOR POWER, ENERGY SYSTEMS, SUCH AS THE SP-100 ARE BEING DESIGNED TO MEET THE ANTICIPATED REQUIREMENTS. THE POWER GENERATION SYSTEM CONCEPTS ARE CURRENTLY BEING REVIEWED FOR AREAS WHERE IMPROVEMENTS CAN BE MADE SO ...

    SBIR Phase II 1988 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government