You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Carbon Foam Lightning and Thermal Protection System

    SBC: TOUCHSTONE RESEARCH LABORATORY, LTD.            Topic: MDA14014

    Touchstone proposes to build on past thermal protection system (TPS) efforts and develop an innovative lightweight and low-cost system that provides protection from lightning strikes as well as from heat and atmospheric debris. This will be accomplished by utilizing a lightweight carbon foam (CFOAM) as the foundational material and varying the properties of the foam through choice of precursor an ...

    SBIR Phase I 2015 Department of DefenseMissile Defense Agency
  2. 25kW 200kWh Energy Storage System based on All-iron Hybrid Flow Battery

    SBC: ESS Tech, Inc.            Topic: DEFOA0000674

    This ARPA-E SBIR project is to research, design, construct and field trial a cost-effective and efficient 25kW 200kWh energy storage system based on the all-Iron Hybrid Flow Battery (IFB) technology. Energy Storage Systems Inc. (ESS) develops and commercializes grid-scale energy storage systems based on flow battery technologies. Applying its proprietary flow cell design, ESS has demonstrated a 4- ...

    SBIR Phase II 2015 Department of EnergyARPA-E
US Flag An Official Website of the United States Government