You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Adding Streaming Capabilities to HDF5

    SBC: Akadio, Inc.            Topic: 01d

    Many applications involved in real-time data collection need to monitor their data while it is being collected- This need occurs in a large and growing number of applications that use common scientific hierarchical data formats for data management, such as aircraft flight testing, autonomous vehicles, particle accelerators, and many more- There are two shortcomings to these formats that make it di ...

    SBIR Phase I 2018 Department of Energy
  2. Complex Network Analysis and Intelligent Monitoring Platform

    SBC: Data Products LLC            Topic: 01a

    As the world continues to rely more heavily on connectivity, it becomes more and more imperative that the networks that support the technical applications leverage intelligence to guide the network operations management- These networks and the applications that utilize them produce massive complex data that range from structured, unstructured, geo‐spatial, images, real and historical to name a f ...

    SBIR Phase I 2018 Department of Energy
  3. Radiation Hardened Infrared Focal Plane Arrays

    SBC: EPIR, INC.            Topic: 30f

    Next generation rare isotope beam facilities will be a critical component of the Department of Energy mission to understand the fundamental forces and particles of nature manifested in nuclear matter- These facilities require a huge financial investment for construction, and it is crucial to achieve and maintain maximum operation efficiency to enable uninterrupted use of the facilities- In produci ...

    SBIR Phase I 2018 Department of Energy
  4. A SRF Photogun for MeV Ultrafast Electron Microscopy

    SBC: EUCLID BEAMLABS LLC            Topic: 11b

    In order to achieve sharp, high resolution real-time imaging, electrons in a MeV UEM (ultrafast electron microscope) beamline need to minimize instabilities energy spread during generation and acceleration- The stability of the normal conducting photocathode gun which is currently used to produce short electron bunches has been one of main elements limiting the further improvement of beam instabil ...

    SBIR Phase I 2018 Department of Energy
  5. Phase Correction Plates for X-Rays

    SBC: EUCLID TECHLABS, LLC            Topic: 09b

    X-ray focusing optics regardless of the technology requires extremely high precision of manufacturing, metrology and operational stability- As the x-ray beam is being transported to the experimental area distortions due to misalignments, imperfection of optics, etc- add up and result in beam quality degradation: broadening, appearance of tails and aberrations- Recently it became possible, using pt ...

    SBIR Phase I 2018 Department of Energy
  6. Inexpensive Electron Beam Optics for Ultrafast Electron Microscopy

    SBC: EUCLID TECHLABS, LLC            Topic: 11a

    Unlike traditional Transmission Electron Microscopes (TEM) Ultrafast Electron Diffraction (UED) and Microscopy (UEM) operate at higher electron energies to preserve the high quality electron beam required for unprecedented temporal and spatial resolution- This however forces stringent requirements on electron- optical components- In particular a set of high field (2 Tesla) solenoids acting as cond ...

    SBIR Phase I 2018 Department of Energy
  7. Rocstar Multiphysics Modernization, Enhancement and Cloud Interface Development

    SBC: ILLINOISROCSTAR LLC            Topic: 03b

    Lack of availability, usability, and the cost of development, ownership, and operation of high performance compute-ready simulation capabilities are significant barriersto utilization of modeling & simulation for American industry- Most open-source, free technologies are difficult to use and/or not validated to the extent needed for industrial application-Many commercial tools that are easy to use ...

    SBIR Phase I 2018 Department of Energy
  8. Extreme Temperature Sample Environment for Materials Research using Neutron Scattering

    SBC: MATERIALS DEVELOPMENT INC            Topic: 12b

    This project addresses the need to access and control extreme temperature sample environments that are used in many research applications at neutron beamline facilities- Development and integration of controlled and extreme sample environments and new measurement techniques is an important aspect of beamline operations and user support- In combination with advanced sample environments, high flux n ...

    SBIR Phase I 2018 Department of Energy
  9. General Techniques for Increasing Packing Density of Metal-Organic Frameworks for Enhanced Volumetric Storage of Hydrogen

    SBC: NUMAT TECHNOLOGIES INC            Topic: 17c

    Techniquestoincreasethedensityofporousmaterialsincludingmetal-­organicframeworks (MOFs) are needed if porous materials are to realize their potential in volumetric hydrogen storage- Improvements in volumetric storage will bring porous materials closer to adoption in fuel cell electric vehicles (FCEVs)- Considerable research effort has been deployed in the discovery of porous materials for hydroge ...

    SBIR Phase I 2018 Department of Energy
  10. Real-time Monitoring and Speciation of Selenium in Pulverized Coal Power Plant Wastewaters

    SBC: OHIO LUMEX CO INC            Topic: 20c

    Ohio Lumex Co- will develop a novel approach to real-time monitoring and speciation of selenium in coal-fired power plant wastewaters- The proposed technology will be developed in response to EPA’s recently issued Effluent Limitations Guidelines pertaining to selenium content in effluent streams from steam power generation plants- The proposed technology will be designed for real-time monitoring ...

    SBIR Phase I 2018 Department of Energy
US Flag An Official Website of the United States Government